AMD: The Seat Is Real. So Is the Price of Admission — and It Isn't in the Revenue Line.
AMD’s AI business is real — its data-centre sales are large and its profits turn into cash. But to win its seat in the AI build-out, AMD gave two customers the right to buy 320 million shares for a penny each — about a fifth of the company — and the schedules that say what those rights cost are blacked out in the filings. The accounting has already switched on: a charge of about $1.1 billion in a single quarter, $4.5 billion more set to come off future revenue, and a charge that grows as AMD’s share price rises. In the same quarter, AMD disclosed roughly $33 billion of guarantees, leases and commitments to partners it does not name.
AMD: The Seat Is Real. So Is the Price of Admission — and It Isn't in the Revenue Line.
Series: CHAIN (CH) · Target: Advanced Micro Devices, Inc. (NASDAQ: AMD) · Registration: CH-2026-005, opened 21 Nov 2026; entry reference $424.39 (close, Fri 20 Nov 2026, Finnhub, corroborated); scored 21 May 2027 · 21 Nov 2027 · 21 Nov 2028 vs SPY, published whole. Direction was not pre-committed at registration.
SUMMARY
The verdict, in plain language. AMD's AI business is real. Data Center revenue of $16.6B in FY2025 and $8.5B in a single quarter (Q3 2026), and profits that convert to cash — $15,982M of operating cash flow against $8,150M of net income across FY2022–25 — are filed facts, and nothing in this report disputes them. What the primary record does not support is the price tag the story omits. To buy its seat in the AI build-out, AMD has issued two customers warrants over 320 million shares at $0.01 — roughly a fifth of the company — whose vesting schedules are redacted in full in the filed exhibits and whose purchase agreements were never filed. The accounting for those warrants switched on in Q3 2026: a $1.2B liability, a $1,097M remeasurement charge in a single quarter, and $4.5B of grant-date value still to be recorded as a reduction of future revenue — with zero shares vested. In the same quarter, AMD's paper disclosed for the first time a stack of guarantees, take-or-pay backstops, partner-bound leases and unnamed infrastructure equity stakes totalling roughly $33.1B of commitment maxima (our computation), with no counterparty named anywhere. And the central variable of the equity story — Instinct/AI revenue — has never appeared in any filing: the phrase "AI revenue" occurs zero times in every 10-K and 10-Q we searched, and the long-range model that prices the stock (>35% revenue CAGR, >$20 non-GAAP EPS, >80% Data Center AI CAGR) was published on 11 November 2025 without being furnished on any 8-K, against a base figure that does not exist in the filed record.
The load-bearing findings:
-
The price of admission is redacted. The OpenAI warrant (8-K acc. 0001193125-25-230895) and the Meta warrant (8-K acc. 0000002488-26-000045) each cover 160M shares at $0.01. In both filed warrants, Exhibit E (Vesting Schedule) and Exhibit F (Exercise Conditions Schedule) are redacted in full; neither the OpenAI Supply Agreement nor Meta's Amendment Eight was ever filed. The warrant's own tax clause (§15) has the parties agree the instruments are a "sales discount or allowance" — by their own drafting, these are price concessions paid in equity. Per-tranche share counts, every intermediate price hurdle, and the exercise conditions are not in the public record.
-
The contra-revenue is already running, and it grows with the share price. Q3 2026 10-Q (acc. 0000002488-26-000191), Notes 2/13/14: grant-date fair value $14.25/share; fair value at 26 Sep 2026 $178.58/share — 12.5× the grant-date value, "as most market conditions had been met"; warrant liability $1.2B; the income-statement line "Change in fair value of warrant liability (1,097)" is identical for the three and nine months — the entire remeasurement is one quarter's event; $4.5B of unrecognized grant-date value remains "to be recorded as a reduction of revenue proportionally as qualifying customer revenue is recognized"; and no warrant shares had vested or become exercisable. The liability is expressly "attributable to qualifying customer revenue recorded to date" — which our reconstruction puts at ~6.72M share-equivalents, ≈2.1% of the programme (computed). The other ~98% of the give-back is still ahead, and its P&L shadow is marked at whatever the share price — the same price the vesting targets require to rise — happens to be.
-
The guarantee stack arrived in one quarter, unnamed. The $4.1B lease guarantee disclosed as an FY2025 subsequent event became, by Q3 2026, $7.7B of lease guarantees plus $750M of debt guarantees ($8.5B total), re-presented as credit derivatives. Around it in the same 10-Q: $13.3B of data-center leases not yet commenced, to be assigned or subleased to commercial partners; a $6,175M cloud-compute take-or-pay backstop (AMD pays for GPU capacity third parties don't buy); $5.1B of equity-investment commitments; $1.9B of stakes in unnamed private cloud/SI companies held through VIEs AMD does not consolidate (Note 12 — the first VIE note in AMD's history); and, as a subsequent event, an unnamed $1.0B investment in "an equity offering of a public company" in October 2026. AMD's own Q1 and Q2 2026 10-Qs add the sentence that connects the two halves of this report: these guarantees "may be issued in exchange for warrants." We do not assert that any VIE or guarantee counterparty is a warrant customer — no filing says so, in either direction. The overlap question is UNRESOLVED, and it is not load-bearing here. What is documented is the scale, the simultaneity, and the absence of names.
-
Every mirror that could confirm the structure is silent. Meta's FY2025 10-K and all three 2026 10-Qs contain zero mentions of "AMD," "warrant," or "derivative asset"; Meta filed no 8-K in February 2026 — the holder's paper does not record the instrument's existence. Microsoft's FY2026 10-K (acc. 0001193125-26-323660) documents its OpenAI loop precisely — $24.1B of revenue, $13.0B committed / $11.9B funded, ~25% as-converted — and contains zero mentions of "AMD" or "Stargate"; the widely repeated "$250B Azure commitment" appears in neither Microsoft filing and is announcement-language, not a filed fact. Oracle's filings contain zero mentions of AMD against a press-release claim of 50,000 GPUs. CoreWeave's 10-K mentions AMD once (CPUs); Nebius's 20-F, zero times.
-
One gigawatt is filed; six are furnished. In each 8-K the only binding purchase commitment is the initial 1 GW — OpenAI's on delivery of MI450 product, Meta's on shipment of 1 GW equivalent. Gigawatts 2–6 exist in the filed text only as the warrants' full-vesting contingency. Neither filing defines "gigawatt." First-tranche vesting is the filed marker for the first gigawatt, and the filed marker reads 0%. On AMD's own published MI355X board power (1,400 W), 1 GW of board power alone is ≈714,000 GPUs (computed) — a build the size of a full Abilene-scale campus, at sites whose documented silicon, in every public record we could reach, is the competitor's.
-
The model was never filed, and its EPS line does not survive the warrants. There is no filing of any form dated 11 Nov 2025 in AMD's submissions record (re-verified). The Analyst Day model — >35% revenue CAGR, >$20 non-GAAP EPS, >80% Data Center AI CAGR — rests on an AI revenue base AMD has never filed. Restated on the share count that full warrant vesting produces (1,960.1M vs 1,640.1M shares), the ">$20" line becomes $16.73 (computed; assumptions stated in §2, Link 6). Holding $20 on the diluted count requires ~$6.4B more non-GAAP net income than the claim, as printed, accounts for.
-
The catch-up is relative fiction, absolute fact. From the two filers' own segment data: AMD's share of combined AMD+NVIDIA Data Center revenue fell 28.71% (CY2022) → 12.02% → 9.85% → 7.91% (CY2025), and ran 7.02–8.59% in every paired quarter from Q1 2025 through Q2 2026 — while AMD's own Data Center revenue grew 2.75×. Both halves are filed facts. The narrative prices a closing gap; the filings document a widening one.
-
A 15% government revenue share with, by the filer's own admission, no instrument. AMD's sentence, verbatim and unchanged from the FY2025 10-K through the Q3 2026 10-Q: officials "expressed an expectation that the U.S. government will receive 15% of the revenue generated from licensed MI308 sales to China. However, to date, the U.S. government has not published a regulation establishing such requirement." NVIDIA's 10-K carries the mirror sentence. The government paper that does exist — an April 2025 company-specific license notice, BIS final rule 91 FR 1684 naming the MI325X (case-by-case review, U.S. third-party testing, no revenue-share provision), and a 14 January 2026 Section 232 proclamation imposing a 25% tariff naming the MI325X — nowhere establishes the 15%. No accrual or payment under it is disclosed in any filing searched. The instrument itself is UNRESOLVED.
What would change this conclusion is set out in full in §7: a filed Instinct revenue figure on the >80%-CAGR path; a first warrant tranche vesting on a disclosed gigawatt; unredacted Exhibits E/F; the VIE and guarantee counterparties named; MI308/MI325 China revenue quantified; a primary government instrument for the 15%. None exists today. The counter-evidence is real and is stated in full in §5: the one completed guidance ladder (2024 MI300) was retrospectively met in a filed release; the revenue and the cash conversion are genuine; the insider selling is 94.5% plan-footnoted; there is no restatement, no auditor rupture, no indictment, and no crowded short. This report's claim is narrower than "AMD's AI business is failing." It is that the price of admission to the AI build-out — in equity given back against the very revenue the deals generate, and in guarantees extended to unnamed partners — is material, documented, and largely invisible in the numbers the story is told with; and that the story's central claims cannot, on the present record, be followed into a document.
Chain grade: nine links (§2). Links 1–7 are Documented in primary records or Documented-and-computed from them. The chain is graded by its weakest load-bearing link — Link 8 (the 15%) — at MODERATE: AMD's words are documented verbatim in two filers' paper, but the arrangement's instrument, accrual and base are in no record we could obtain, and we do not claim to know them. Link 9 (the insider tape) is graded CORROBORATED/PATTERN and is expressly not load-bearing: the central claim stands without it.
1. Epigraphs — the documents' own words
"…the parties agree the warrants are a 'sales discount or allowance'…" — §15 (tax intent) of the customer warrants, as characterised in the filed instruments (OpenAI warrant, Ex. 4.1 to acc. 0001193125-25-230895; Meta warrant, Ex. 4.1 to acc. 0000002488-26-000045)
"Guarantees typically become payable in the event of a commercial partner's default and may be issued in exchange for warrants." — AMD, Q1 2026 Form 10-Q (acc. 0000002488-26-000076), Note 8; repeated Q2 2026
"In August 2025, U.S. government officials expressed an expectation that the U.S. government will receive 15% of the revenue generated from licensed MI308 sales to China. However, to date, the U.S. government has not published a regulation establishing such requirement." — AMD, FY2025 Form 10-K (acc. 0000002488-26-000018); repeated verbatim, Q3 2026 Form 10-Q
"Our partnership with OpenAI is expected to deliver tens of billions of dollars in revenue for AMD… and is expected to be highly accretive to AMD's non-GAAP earnings-per-share." — Jean Hu, EVP/CFO, in the furnished Ex-99.1 to the OpenAI 8-K — a release, not a filed agreement
"As of September 26, 2026, no warrant shares had vested or become exercisable, or been exercised, forfeited or expired." — AMD, Q3 2026 Form 10-Q (acc. 0000002488-26-000191), Note 14
2. The chain
Link 1 — The redacted price of admission — STRONG (Documented)
Twice in five months, AMD paid for a headline with the same instrument.
OpenAI. 8-K filed 6 October 2025 (acc. 0001193125-25-230895): on 5 October 2025 AMD issued to OpenAI OpCo, LLC a warrant to purchase up to 160,000,000 shares at $0.01 per share, in connection with a Product Purchase Agreement for AMD Instinct products — described in the warrant itself as "a material inducement for OpenAI to enter into the Supply Agreement." First tranche vesting follows delivery of the initial 1 GW of MI450-series product; full vesting is contingent on purchases of 6 GW, with stock-price targets escalating to $600 per share for the final tranche. Expiry 5 October 2030.
Meta. 8-K filed 24 February 2026 (acc. 0000002488-26-000045): on 23 February 2026 AMD issued to Meta Platforms, Inc. a second performance-based warrant for up to 160,000,000 shares at $0.01, under Amendment Eight to a Master Purchase Agreement dated 23 May 2023. First tranche vesting follows shipment of the initial 1 GW equivalent; full vesting is contingent on 6 GW equivalent. Expiry 23 February 2031.
Combined: 320 million shares at $0.01 against 1,640,087,251 shares outstanding (Q3 2026 10-Q cover) — 19.5% of the company (computed). Total cash proceeds at full cash exercise: $3.2M (computed). The warrants are not a financing. By the warrants' own §15 tax-intent clause, the parties agree the arrangement is a "sales discount or allowance" — the deals are, by their own drafting, price concessions paid in equity.
What the filed record does not contain is the operative core of both deals:
- In both filed warrants (Ex. 4.1 in each 8-K), Exhibit E (Vesting Schedule) and Exhibit F (Exercise Conditions Schedule) are redacted in full — "[***]" — as are Exhibits A–D in the Meta instrument. Per-tranche share counts, every intermediate share-price hurdle, the OpenAI "stock performance thresholds" (the Q3 2026 10-Q adds only that certain tranches reference performance "relative to a market index"), and the technical and commercial exercise conditions are not in the filed record.
- Neither purchase agreement was filed. Ex. 10.1 in both 8-Ks is the Registration Rights Agreement. No price, unit count, delivery schedule, take-or-pay term, or termination provision for either programme appears in any filed document.
- The Q3 2026 10-Q (Note 14) confirms warrants were issued "to two customers." No third customer warrant exists in any filing searched.
What this link establishes: the two largest commercial arrangements in AMD's history carry equity consideration of ~19.5% of the share count, and the schedules that would let a reader audit what that equity costs, tranche by tranche and hurdle by hurdle, are withheld from the only filings that contain the instruments. The redaction is itself the documented fact; we describe the exhibits as redacted and do not guess at their contents anywhere in this report.
Link 2 — Contra-revenue, already switched on — STRONG (Documented + computed)
The warrants are not a future dilution footnote. Under AMD's own accounting policy they are a running charge against the revenue the deals produce. Q3 2026 10-Q (acc. 0000002488-26-000191), Note 2, verbatim:
"Warrants to purchase the Company's common stock issued to customers represent consideration payable to a customer under ASC 606 … Fair value on the grant date of the warrant shares probable of vesting is recorded as a reduction to revenue proportionally as qualifying customer revenues are recorded, initially with a corresponding liability recorded within Other long-term liabilities … remeasured to fair value each reporting period, with changes in fair value after grant date recorded within Other income (expense), net, until each tranche becomes exercisable, at which point the related liability is reclassified to Additional paid-in capital …"
Note 14 supplies the numbers:
- Weighted-average grant-date fair value: $14.25 per share (Monte Carlo; volatility 49%–56%; risk-free 3.56%–3.69%; term 5 years).
- Fair value at 26 September 2026: $178.58 per share — 12.53× the grant-date value (computed) — "based on the Company's updated probability of the customers meeting the conditions required for exercisability and primarily on its closing stock price as most market conditions had been met."
- Warrant liability: $1.2B, "representing the fair value of the warrants attributable to qualifying customer revenue recorded to date."
- The face of the statements: "Change in fair value of warrant liability (1,097)" — $1,097M — for both the three and the nine months ended 26 Sep 2026. The entire remeasurement is a Q3 2026 event. Note 14 rounds the quarter's noncash charge to "$1.2 billion, primarily related to a loss from remeasurement"; the cash-flow statement adds back "Non-cash impact of warrants issued to customers, net 1,179" (nine months). The ~$103M gap between Note 14's narrative figure and the $1,097M face line is of the same size as the computed grant-date portion (~$96M) — i.e., the narrative figure appears to describe the total warrant effect while the face line isolates remeasurement. The filing does not reconcile the two numbers expressly; that bridge is our inference, labelled as such. A residual of ~$36M between two reconstructions of grant-date value recognised to date (~$96M vs ~$60M) is likewise not reconciled in the filing (UNRESOLVED).
- Unrecognized grant-date fair value: $4.5B — "representing the remaining value that would be recorded as a reduction of revenue proportionally as qualifying customer revenue is recognized."
- "As of September 26, 2026, no warrant shares had vested or become exercisable, or been exercised, forfeited or expired. No warrant liability had been reclassified to Additional paid-in capital." Note 13: the 320M shares are contingently issuable and excluded from basic and diluted EPS until vesting conditions are satisfied.
The reconstruction (every derived figure computed; full schedule: Lane C's warrant contra-revenue schedule): the total grant-date pool is 320M × $14.25 = $4,560M — a total the filing never states. The $1.2B liability at $178.58 implies ≈6.72M share-equivalents attributable to qualifying revenue to date — ≈2.1% of the programme. The implied remeasurement on that slice (~$1,104M) ties to the filed $1,097M within ~$7M: the arithmetic ties; there is no break in the warrant disclosure. What the tied arithmetic shows is the shape of what remains. Recognition runs proportionally with revenue and ahead of vesting — revenue can qualify before any tranche vests, which partly explains how a $1.2B liability coexists with zero vesting. What the filing does not explain is the substance underneath: which customer's purchases generated the qualifying revenue, in what amount, for which products, in a period when — on the releases' own timetable — MI450 deployments were to begin only in 2H 2026. The dollars, the customer split, and the gigawatt equivalent are all undisclosed (UNRESOLVED).
And the effective rate of the give-back cannot be computed, because cumulative qualifying revenue is undisclosed. At full vesting, under explicitly assumed programme revenue (computed): $10B of qualifying revenue → 45.6% given back as contra-revenue at grant-date value; $20B → 22.8%; $30B → 15.2%; $45.6B → 10.0%. The release framing — "tens of billions of dollars in revenue" — sits inside exactly this range of assumptions: at its low end, roughly a third to nearly half of the headline revenue would be offset by the grant-date contra-revenue alone, before remeasurement. That sentence is arithmetic on stated assumptions, labelled inference as to the range — and it is the only way the filed record permits the question to be asked at all.
The feedback loop is in the documents, not an inference: the customers' equity vests only if AMD's share price reaches targets escalating to $600; the warrants' fair value — and therefore the charge against AMD's revenue and P&L — rises with AMD's share price; and the customers' incentive to keep purchasing is the vesting itself. A $1,097M charge was incurred on the first ~2.1% of the programme, in a quarter when the share price rose. No filing characterises this as circular, and neither do we. We record the mechanics.
What this link establishes: the discount is not hypothetical or deferred to vesting. It is switched on, it has already cost a $1,097M single-quarter P&L charge and ~$96M of revenue reduction (computed) on ~2.1% of the programme, $4.5B more is contractually queued against future revenue, and the charge mechanically grows with the share price the vesting targets require.
Link 3 — The guarantee stack: $33B of commitment maxima, no names — STRONG (Documented)
In the same quarter the warrant accounting switched on, AMD's paper disclosed — mostly for the first time — a second balance sheet pointed at the same ecosystem. Every figure below is from the Q3 2026 10-Q (acc. 0000002488-26-000191) unless noted; the stack total is our computation of commitment maxima — not liabilities, and not additive in an accounting sense.
The guarantee trail. FY2025 10-K (acc. 0000002488-26-000018), Note 19 (Subsequent Events): "Subsequent to December 27, 2025, the Company entered into an agreement to guarantee a commercial partner's data center lease obligations in the event of their default. The maximum gross exposure is $4.1 billion… The fair value of the guarantee liability is not expected to be material." Singular: a commercial partner, unnamed. Q1 2026 (acc. 0000002488-26-000076) and Q2 2026 (acc. 0000002488-26-000123) repeat the $4.1B — and add the sentence the screen of this report initially missed:
"Guarantees typically become payable in the event of a commercial partner's default and may be issued in exchange for warrants."
Q3 2026 re-presents the whole book. Note 8 (Credit Derivatives): data-center lease guarantees of $7.7B maximum gross exposure over terms up to 15 years, plus a new class — commercial-partner debt guarantees of $750M, terms up to 6 months, covering "borrowings used to finance data center infrastructure." Note 11 (Guarantees): "the maximum potential amount of future payments under these guarantees was $8.5 billion." (Computed check: $7.7B + $0.75B = $8.45B ≈ the filed $8.5B — the two legs reconcile within rounding.) The population has widened from "a commercial partner" to "certain commercial partners"; the guarantees are accounted for as credit derivatives, Level 3, carried at fair values AMD reports as not material; at 26 Sep 2026 no partner was in default and nothing had been paid. The Q3 text drops the "may be issued in exchange for warrants" sentence without retracting it. Whether any guarantee was issued in exchange for warrants — and if so, whose warrants, in what amount, carried where — is nowhere filed (UNRESOLVED). It remains the only sentence in any filing we read in which AMD receives equity consideration for extending credit support to the infrastructure ecosystem: the mirror image of Link 1, in which AMD gives equity to obtain orders.
The VIE note that appears from nowhere. The string "variable interest entit…" occurs zero times in every AMD filing through Q2 2026. Q3 2026 Note 12, verbatim:
"The Company holds various forms of interests in VIEs, including investments in certain privately held cloud and SI infrastructure companies, credit derivatives, commitments to purchase cloud compute capacity from certain CSPs, and subleases of certain data center facilities to commercial partners. The Company has determined that it does not have the power to direct the activities that most significantly impact the economic performance of these entities. Therefore, the Company is not the primary beneficiary, and these VIEs are not consolidated…"
Note 8 gives the carrying amounts: the private cloud/SI stakes were $1.9B at 26 Sep 2026, up from $1.1B at 27 Dec 2025, including cumulative gross unrealised gains of $145M — down from $291M at FY2025-end. The increase is therefore new money invested, not mark-ups (computed from two filed figures; the filing does not state the invested amount directly). The balances existed from FY2025 year-end; the VIE characterisation arrived only in Q3 2026.
The rest of the stack (same 10-Q). Equity-investment commitments of up to $5.1B, "primarily in privately held companies that develop SI and other technologies, including early-stage companies," expected through fiscal 2028 — and, in the same note's subsequent events: "the Company invested $1.0 billion in an equity offering of a public company in October 2026." The investee is not named. A $6,175M cloud-compute commitment under which AMD "commits to purchase GPU compute capacity from CSPs, either to the extent the capacity is not purchased by third-party customers, or for capacity reserved by the Company that it may sell or assign to third parties" — read plainly, a take-or-pay backstop: AMD owes for GPU capacity if third-party customers do not buy it; the filing does not say whose GPUs the capacity runs on, which CSPs, or which customers. $13.3B of data-center leases not yet commenced, "expected to be assigned or subleased to commercial partners," terms 10–15 years, commencing from Q2 FY2027 — against $896M of future sublease payments to be received on the commenced side (a scale observation across two filed figures, not a matched pair). Purchase commitments total $48,761M. Stack total (computed): $5.1B + $6.175B + $13.3B + $8.5B ≈ $33.1B of forward commitment maxima disclosed in a single 10-Q, alongside the $1.9B of VIE equity already carried and $48,761M of purchase commitments. No filing names any counterparty in any leg of it.
We attempted the identifications the documents standard requires. CoreWeave's FY2025 10-K (acc. 0001769628-26-000104) contains exactly one "AMD" mention — CPUs in a cluster description; its Q3 2026 10-Q (acc. 0001769628-26-000465) contains none. Nebius's FY2025 20-F (acc. 0001104659-26-052948) contains none. No public neocloud or SI filing read names an AMD equity stake, guarantee, or credit support. The identities stay UNRESOLVED, and the negative search is the deliverable.
The boundary of this link, stated as a rule: no AMD filing states that any VIE counterparty is, or is not, OpenAI, Meta, a warrant customer, or a source of qualifying revenue. This report does not assert any overlap between the VIE/guarantee counterparties and the warrant customers, and the chain's central claim does not depend on one. What is load-bearing is documented without it: in one quarter, AMD's disclosed exposure to the AI-infrastructure ecosystem — guarantees re-presented as credit derivatives, a first-ever VIE note, a take-or-pay compute backstop, $13.3B of partner-bound leases — roughly doubled and formalised, behind counterparty names no filing provides, under a sentence in AMD's own paper contemplating warrants received in exchange for guarantees.
Link 4 — The silent mirrors — STRONG (Documented negatives)
A structure this size should cast shadows in other companies' filings. We read the filings where the shadows would fall. They are empty — and the emptiness is documented filing by filing, not summarised.
Meta — the holder that does not mention its own warrant. Filings pulled from EDGAR and searched in full text (extraction sanity-checked: "revenue" returns 178–236 hits per document):
| Meta filing | Filed | Accession | "AMD" | "warrant" | "derivative asset" |
|---|---|---|---|---|---|
| 10-K FY2025 | 29 Jan 2026 | 0001628280-26-003942 | 0 | 0 | 0 |
| 10-Q Q1 2026 | 30 Apr 2026 | 0001628280-26-028526 | 0 | 0 | 0 |
| 10-Q Q2 2026 | 30 Jul 2026 | 0001628280-26-050705 | 0 | 0 | 0 |
| 10-Q Q3 2026 | 22 Oct 2026 | 0001628280-26-066773 | 0 | 0 | 0 |
"Advanced Micro," "OpenAI" and "Stargate" also return zero in all four. Meta's submissions record contains no 8-K filed in February 2026 at all — the warrant event produced no current report from the holder's side either. Meta's balance sheet carries $32,624M of "Non-marketable equity investments" (30 Sep 2026), but no line, note, or fair-value table identifies an AMD warrant or any asset received from a supplier; whether Meta carries the instrument inside an aggregated line is not determinable from its filings (UNRESOLVED as to internal treatment; documented as undisclosed). For contrast, Meta does describe its accounting in detail where it chooses to: its Louisiana and Texas data-center ventures are disclosed as 20% equity-method VIE interests with residual-value guarantees. The warrant receives no comparable treatment. And Meta's filings therefore do not un-redact Exhibits E/F: the schedules remain redacted in the only filing that contains them.
One adjacent Meta disclosure is recorded here precisely so that it is not attributed: Meta's 2026 10-Qs disclose large escrows under unnamed "multi-year infrastructure purchase agreements" — $5.00B of money-market funds in escrow at 31 Mar 2026, rising to $10.80B at 30 Jun and 30 Sep 2026, "expected to be released between 2028 and 2030 upon satisfying the underlying purchase obligations." No Meta filing names the counterparties. The timing — the first escrow appears in the quarter the AMD warrant issued — is a documented coincidence of dates, nothing more. Whether any part of those escrows relates to AMD is UNRESOLVED and is not asserted in either direction.
Microsoft — the loop that is documented, and where it stops. FY2026 10-K (filed 29 Jul 2026, acc. 0001193125-26-323660), verbatim: "We recorded revenue from commercial arrangements with OpenAI, inclusive of revenue-sharing payments, of $24.1 billion, and accounts receivable from OpenAI as of June 30, 2026 was $6.0 billion. We have made total funding commitments of $13.0 billion… of which $11.9 billion has been funded," under an equity-method investment of "an approximate 25% interest on an as-converted basis"; Note 3 records $6.5B of FY2026 net gains from OpenAI investments. Q1 FY2027 10-Q (acc. 0001193125-26-436133) updates the loop: $10.0B of OpenAI revenue in one quarter, $7.2B receivable, $12.0B funded, ~24% interest. In both filings: "AMD" — 0 mentions; "Advanced Micro" — 0; "Stargate" — 0. The "$250 billion incremental Azure commitment" attributed to OpenAI in October 2025 announcement coverage appears in neither filing; Microsoft discloses commercial remaining performance obligations only in aggregate ($678B at 30 Jun 2026). The $250B figure is announcement-language, and this report labels it as such wherever it matters. The filed record thus documents a Microsoft–OpenAI loop in precise numbers — Microsoft funds OpenAI; OpenAI buys Microsoft cloud; Microsoft books the revenue and the receivable — and no connection from that loop to AMD. How OpenAI funds its binding 1 GW AMD commitment, let alone 6 GW, is addressed by no filing and no OpenAI publication we read (UNRESOLVED, and not asserted). OpenAI's own published statements add nothing filed-grade: its AMD announcement republishes the joint release; its Stargate posts name Oracle and SoftBank, attach a >$300B figure to the Oracle agreement, and list AMD as one name in a silicon list with no amount attached.
Oracle — the 50,000-GPU claim with no counterparty paper. The 14 Oct 2025 release promised OCI as launch partner for an MI450 supercluster with "an initial deployment of 50,000 GPUs starting in calendar Q3 2026." Oracle's FY2026 10-K (acc. 0001193125-26-277521) and Q1 FY2027 10-Q (acc. 0001193125-26-389274, filed 11 Sep 2026 — still Oracle's latest periodic filing at 21 Nov 2026): "AMD" 0, "Advanced Micro" 0. Oracle discloses $664B of remaining performance obligations in aggregate, unattributable by vendor. Q3 2026 — the quarter the deployment was to begin — has closed, and the claim still lives only in the two companies' press releases: neither confirmed nor refuted by the counterparty's filings, and there is no Oracle equity deal in any filing searched.
CoreWeave / Nebius — covered in Link 3: no AMD equity, guarantee, or purchase paper in the two largest listed neoclouds' filings.
What this link establishes: every counterparty filing that could confirm the structure — the warrant holder's, the anchor funder's, the deployment partner's, the neoclouds' — is silent on AMD. The structure exists, in the public record, on one side only: the issuer's. That asymmetry is documented, filing by filing, and it is why the report's remaining links grade the claims against AMD's own paper rather than against any corroboration.
Link 5 — One gigawatt filed, six gigawatts furnished — STRONG (Documented)
The headline number and the filed number differ by a factor of six, in both deals, in the same way.
What is filed. OpenAI 8-K, Item 1.01, verbatim: "Concurrent with signing, Warrantholder agreed to a binding commitment to purchase (directly or through its affiliates or Authorized Purchasers) the initial one (1) gigawatt of AMD Instinct MI450 Series GPU products," with the first tranche vesting "after the delivery of the initial one (1) gigawatt" and "full vesting for the 160 million shares contingent upon… purchasing six (6) gigawatts." Meta 8-K, verbatim in substance: a "binding commitment… to purchase… the initial one (1) gigawatt equivalent of certain AMD Instinct GPU products," first tranche vesting "upon shipment of the initial one (1) gigawatt equivalent," full vesting contingent on six. The triggers differ — delivery vs shipment — a physically meaningful difference in where in the chain vesting can occur (installed-and-delivered vs factory gate), and neither term is defined further.
What is furnished. "Deploy 6 Gigawatts of AMD GPUs" is the headline of Ex-99.1 — furnished under Item 7.01, expressly not "filed." "Tens of billions of dollars in revenue" and "highly accretive" (CFO Hu) live in the same exhibit, with no period, amount, or filed agreement behind either phrase. The Meta release likewise headlines "up to 6 gigawatts."
The unit is undefined. Neither 8-K, neither warrant, and no later 10-Q defines what a "gigawatt" — or Meta's "gigawatt equivalent" — is measured on: GPU board-power sum, rack IT load, or facility load differ by 30–60% for the same hardware. The measurement basis is UNRESOLVED, and it controls every downstream conversion.
What 1 GW physically requires (computed, inputs stated). AMD publishes no MI455X board-power figure and no Helios rack-power figure (its MI455X spec page lists 432 GB HBM4, 23.3 TB/s, 40.3 PFLOPS MXFP4 — and no TBP). Anchoring on the last published part: at the MI355X's published maximum board power of 1,400 W, 1 GW of GPU board power alone is ≈714,300 GPUs — ≈5,580 liquid-cooled racks at AMD's 128-GPU rack density — before host CPUs, networking, cooling, or facility overhead; at an illustrative PUE of 1.2–1.3 (assumption, labelled), ≈1.2–1.3 GW of facility load. On the Helios configuration (72 GPUs/rack) at a secondary rack-power estimate of ~140 kW (AMD publishes none; flagged), 1 GW of IT load is ≈7,140 racks / ≈514,300 GPUs. On any basis, the first 1 GW of either deal is on the order of half a million to three-quarters of a million accelerators — roughly a full Abilene-scale campus (1.2 GW design capacity) of AMD hardware alone.
The physical record. The build-out at the customers' named sites is real and enormous — and, in every public record this investigation could reach, not AMD-specific. Abilene, TX: ~1.2 GW design, 618 MW delivered across 6 of 8 buildings by Sep 2026 (Oracle, on its 10 Sep 2026 call; secondary) — documented as an NVIDIA GB200 site (~450,000 GB200 GPUs at completion, per Oracle's chairman as reported; secondary). Seven announced Stargate successors (Shackelford County TX, Doña Ana County NM, Port Washington WI, Saline Township MI, Milam County TX, Lordstown OH) document capacity generically; no county permit, appraisal, interconnection-queue entry, or utility filing retrieved names AMD, MI450/MI455X, or Helios at any site. Meta's Prometheus (New Albany, OH): ~471 MW running late 2026 (secondary estimates), attributed by third-party trackers to NVIDIA parts; no document connects the AMD commitment to it by name. Meta's Hyperion (Richland Parish, LA): LPSC docket U-37425 approved 2,262 MW of new generation online late 2028 — timing-inconsistent with hosting a first tranche whose shipments begin in 2H 2026. The rack path is documented: AMD acquired ZT Systems (Mar 2025), kept the design business, and sold manufacturing to Sanmina (closed Oct 2025; Sanmina is "preferred new product introduction (NPI) manufacturing partner," 8-K Ex-99.1, 19 May 2025) — AMD does not manufacture Helios racks. Sanmina's CFO said on 9 Nov 2026 (secondary — earnings-call reporting) that Helios shipping had begun "albeit in small quantities."
The evidenced fraction. On the only filed metric — vesting — it is 0%: no shares vested at 26 Sep 2026, and first-tranche vesting is the 1 GW marker. AMD's Q3 2026 prepared remarks (3 Nov 2026; company-published, not filed) state that lead customers including OpenAI and Meta "brought their first Helios racks online" in the quarter — real, and uncounted: no rack count, no MW, no site. The evidenced fraction is therefore greater than zero racks and less than any number the record can defend. We state the limit exactly, because it cuts both ways (§5): fit-outs are routinely undisclosed at silicon level, and absence from the public record is a finding about the record, not about the racks.
What this link establishes: the binding, filed commitment in each deal is one gigawatt under an undefined unit, with vesting — the filer's own marker — at zero; the six-gigawatt figure that prices the story is release language; and the first gigawatt, on any physical basis, is a build of Abilene scale for which no AMD-specific public record exists at any named site.
Link 6 — The unfiled model — STRONG (Documented + computed)
On 11 November 2025, at its Financial Analyst Day in New York, AMD published the largest forward financial claims in its history. Dr. Lisa Su (opening and closing) and CFO Jean Hu (the financial model) presented, verbatim from the release: revenue CAGR "greater than 35%," non-GAAP operating margin "greater than 35%," non-GAAP EPS "exceeding $20," Data Center CAGR ">60%," Data Center AI CAGR "more than 80%," over a printed horizon of "the next 3–5 years"; Hu put the TAM "from $200 billion this year to over $1 trillion in 2030" and "a trajectory to tens of billion of data center AI revenue in 2027." (Secondary coverage that attaches "2030" to the EPS line is an analyst reading; the materials attach 2030 to the TAM only, and this report does not adopt the other reading.)
The model was never furnished to the SEC. AMD's submissions record contains no filing of any form dated 11 Nov 2025 — verified at screen stage and re-verified in the lanes (bracketing filings: the Q3 2025 8-K of 4 Nov 2025, acc. 0000002488-25-000163; the 10-Q of 5 Nov 2025, acc. 0000002488-25-000166; then a Form 4 on 18 Nov). No 8-K at any date furnishes the Analyst Day materials. The model exists only as a Globe Newswire release and IR-hosted decks and transcripts — company-published, not filed. Regulation FD is not alleged to be breached; the material was publicly webcast and posted. The documented fact is the absence from the filed record, which is what a CHAIN report measures claims against. The decks carried a full PSLRA cautionary statement and an express statement that a GAAP reconciliation of the forward non-GAAP model was "not practicable"; the model's baseline footnote excludes the $800M of Q2 2025 export-control charges. The disclaimers are complete and conventional — and they are part of the paper trail: safe-harboured, unreconciled, update-disclaimed.
The base does not exist. Against the filed base (FY2025 10-K): revenue $34,639M, non-GAAP diluted EPS $4.17, non-GAAP operating margin ~22.5%. The EPS line is therefore a >4.8× expansion claim (computed). Its central growth line — >80% Data Center AI CAGR — has no filed base-year figure: AMD has never filed an annual Instinct/AI revenue number for 2025, or for any year other than the single retrospective 2024 sentence (§5). The claim is, from the filed record, unverifiable and unfalsifiable — by construction. Machine counts make the absence precise: across the FY2022–Q3 2026 filing series, "AI revenue" occurs 0 times; "artificial intelligence revenue" occurs 0 times (Lane C's filing-drift counts; every screen count independently reproduced). What drifts instead is the basket's label: the Data Center segment description is re-ordered across the series to lead with "AI accelerators" (FY2025) and then "Artificial Intelligence (AI) accelerators" (Q3 2026) — while remaining, by the filer's own definition in every period, a mixed basket of accelerators, server CPUs, GPUs, APUs, DPUs, NICs, FPGAs and SoCs. The metric the equity story trades on has no filed definition at any point in the series.
The EPS line does not survive the warrants (computed; assumptions stated). Assumptions: (i) period-end shares outstanding 1,640.1M (Q3 2026 10-Q cover, 28 Oct 2026) — using FY2025 diluted weighted-average shares (1,636M) instead changes the result by less than $0.01; (ii) full vesting adds 320M shares → 1,960.1M (count expansion +19.51%; dilution of pre-existing holders 16.33%); (iii) non-GAAP net income held constant — the warrants' own P&L effects are excluded from this purely arithmetic restatement, and how AMD's non-GAAP definition would treat contra-revenue and remeasurement is not stated in the Analyst Day materials (UNRESOLVED). On those assumptions: ">$20" on 1,640.1M shares implies non-GAAP net income of >$32.80B; the same income on 1,960.1M shares is $16.73 per share; holding $20.00 on the diluted count requires >$39.20B — an additional ~$6.40B the claim, as printed, does not account for. The claim was published five weeks after the first 160M-share warrant was issued, and the share count it silently assumes is the pre-warrant count. (A second internal tension, computed and flagged without resolution: at exactly 35% CAGR the revenue line implies ~$155.3B at year 5, while at exactly 60% CAGR the Data Center line implies ~$174.4B at year 5 — more than the company total — so the two lines are jointly consistent only at the shorter end of the 3–5-year window or with deceleration inside it. The materials do not reconcile this.)
The drift around the model tells the same story in the filer's own word counts (Lane C; full table in §9): OpenAI mentions run 10 (FY2025 10-K) → 8 → 8 → 1 (Q3 2026, the risk-factor dilution line); \bMeta\b enters the periodic reports only with the Q1 2026 10-Q (13), then 7, then 1; warrants rises 12 (FY2022, a legacy 300,260-share warrant) → 38 (Q3 2026); qualifying jumps 2 → 5 as "qualifying customer revenue" enters Notes 2/14. The counterparties' names exit the disclosure in the quarter the accounting turns on; the generic phrase — "the customers" — replaces them.
What this link establishes: the valuation's central document is an unfurnished, unreconciled model whose growth engine has no filed base and whose per-share line silently assumes a share count that the issuer's own warrants — the first of them five weeks old on the day — had already superseded.
Link 7 — The relative gap — STRONG (Documented + computed)
The catch-up narrative can be tested without any third-party data, because both companies file the same line. Lane C built the series from the two filers' own segment/end-market revenue (rendered tables; method and a data-integrity caveat in §9; dataset: Lane C's data-center market-share series):
| Period | AMD DC ($M) | NVIDIA DC ($M) | Combined ($M) | AMD share (computed) | NVDA ÷ AMD |
|---|---|---|---|---|---|
| CY2022 | 6,043 | 15,005 | 21,048 | 28.71% | 2.48× |
| CY2023 | 6,496 | 47,525 | 54,021 | 12.02% | 7.32× |
| CY2024 | 12,579 | 115,186 | 127,765 | 9.85% | 9.16× |
| CY2025 | 16,635 | 193,737 | 210,372 | 7.91% | 11.65× |
Paired quarters (NVIDIA quarters paired to calendar quarters by end month, the screen's convention): Q1 2025 8.59% · Q2 2025 7.31% · Q3 2025 7.81% · Q4 2025 7.95% · Q1 2026 7.13% · Q2 2026 7.02% — AMD's share sat between 7.02% and 8.59% in every paired quarter, with no closing trend. AMD's Q3 2026 Data Center revenue was $8,546M; NVIDIA's Q3 FY2027 10-Q was not yet filed at the 22 Nov 2026 EDGAR check, so no Q3 2026 pair exists (UNRESOLVED, not estimated).
The counter-evidence lives inside this link, by design: AMD's own Data Center revenue grew 2.75× across the same window — $6,043M to $16,635M — and reached $8,546M in a single quarter, larger than its entire CY2022 year. The share loss is a relative fact, not an absolute decline: the other filer's filed revenue grew faster in absolute dollars in every period. The series also cannot say what fraction of either line is AI accelerators — AMD does not break out Instinct revenue in any filing (Link 6), and NVIDIA's Data Center line is likewise an end-market total. What the series supports is exactly what it shows: the narrative prices a second source closing on the leader; the filed arithmetic documents the gap widening every year of the story, from a company whose absolute growth is genuine.
What this link establishes: on the only like-for-like filed measure available, AMD's relative position in the market its valuation story is about shrank from more than a quarter to under a twelfth, in every period measured, while it grew. Both halves are the finding.
Link 8 — The extra-legal 15% — MODERATE (Documented as to the filers' words; the instrument itself UNRESOLVED)
This is the chain's weakest load-bearing link, and the report grades the chain by it.
The filers' words. AMD, FY2025 10-K (acc. 0000002488-26-000018), risk factor, verbatim — repeated in materially identical words in MD&A and, unchanged, in the Q3 2026 10-Q eleven months after the events:
"In August 2025, U.S. government officials expressed an expectation that the U.S. government will receive 15% of the revenue generated from licensed MI308 sales to China. However, to date, the U.S. government has not published a regulation establishing such requirement. Any request for a percentage of the revenue by the U.S. government could subject us to litigation, increase our costs and harm our competitive position and benefit competitors that are not subject to such arrangements."
NVIDIA's FY2026 10-K (acc. 0001045810-26-000021) carries the mirror sentence: "USG officials expressed an expectation that the USG will receive 15% or more of the revenue generated from licensed sales of our products, but the USG did not publish a regulation codifying such requirement." Two issuers, two audit firms, the same structure: expectation expressed; no regulation published. (One asymmetry is documented: NVIDIA quantifies its licensed H20 revenue, ~$60M; AMD quantifies no MI308 revenue in any filing — so for AMD, the base to which the 15% would apply is as undisclosed as the percentage's legal status.)
The history the percentage sits on (each step tied to its document). April 2025: a new license requirement for MI308 exports to D:5 destinations, imposed — per the issuers' 8-Ks — by company-specific U.S. government notice, not by any published rule this investigation could locate (AMD 8-K, 15 Apr 2025, acc. 0000002488-25-000039: expected charges "up to approximately $800 million"). Q2 2025: the charge lands — "approximately $800 million of inventory and related charges" (Q2 2025 10-Q, acc. 0000002488-25-000108), driving the Data Center segment to a $(155)M operating loss that quarter. FY2025: licenses granted, Q4 2025 shipments began, "reversed approximately $360 million of the charges" — net ~$440M. August 2025: the 15% arrangement is reported (FT, 10 Aug; Reuters/Bloomberg/AP, 11 Aug — secondary) and confirmed orally by the President at an 11 Aug 2025 press conference — the most senior on-record government statement located — who said he had originally wanted 20% and credited NVIDIA's CEO with negotiating him down to 15% (secondary-reported). The House Select Committee's leadership of both parties questioned the arrangement's legal basis on the record (Ranking Member Krishnamoorthi's statement, Aug 2025: "what legal authority it has for extracting revenue-sharing as a condition for export licenses"). No White House fact sheet, executive order, or BIS document stating a 15% revenue share was located on whitehouse.gov, bis.gov, or in the Federal Register — a documented negative, stated as a search result, not as proof of non-existence.
The government paper that does exist documents different machinery. (i) BIS final rule 91 FR 1684 (FR Doc. 2026-00789, RIN 0694-AK43, effective 15 Jan 2026): license review for H200-class exports to China/Macau moves from presumption of denial to case-by-case; the operative text names the "AMD MI325X" expressly; conditions include U.S. supply certifications and "independent, third-party testing in the United States." The rule contains no revenue-share provision. (ii) The Section 232 proclamation of 14 Jan 2026 (White House Fact Sheet): "The President also imposed a 25% tariff on certain advanced computing chips, such as the NVIDIA H200 and AMD MI325X" — the documented mechanism behind the 2026 10-Qs' language: MI325 product must enter the U.S. for the inspection stop, and entry is the tariff event. Whether the 25% tariff is the collection mechanism for the percentage publicly announced in December 2025 is not stated in any primary document located — UNRESOLVED. (iii) February 2026: MI325 licenses granted (Q1 2026 10-Q, repeated verbatim in Q2/Q3): "We do not yet know whether any imports of MI325 products will be allowed into China… any MI325 shipped under the licenses will be subject to a 25% tariff upon importation into the United States for the inspection." As of the Q3 2026 filing, AMD does not state that any MI325 unit has been imported into China.
The money. Full-text search of the Q3 2026 10-Q finds no 15% liability, expense line, or contingency amount; the FY2025 10-K discloses no amount. No accrual or payment under the 15% is disclosed in any AMD filing searched; whether any amount has been accrued or paid is UNRESOLVED. Secondary reporting (Politico, date not verified in the lanes) that the arrangement "had not yet produced payments because the administration had not issued the regulations to codify it" is consistent with the primary record but is not a substitute for it.
The language drift frames the link (Lane C counts): export control mentions run 4 (FY2022 10-K) → 5 → 8 → 16 (FY2025 10-K) → 15 in the Q3 2026 10-Q alone; MI308 0 → 14 → 8; MI325 becomes a licensing subject only in 2026. The series moves generic → priced ($800M/$360M) → extra-legal (an "expectation" with no regulation) → two-sovereign (a U.S. inspection tariff plus a Chinese import gate) without any single filing announcing the change of kind.
What this link establishes — and what it does not. Documented: a revenue-share expectation acknowledged identically by both affected issuers, on the record from the President and questioned on the record by Congress, implemented by no located regulation, order, or license condition in the public record, with no accrual, no payment, and no revenue base disclosed. Not documented, and not claimed: that the arrangement is unlawful, that it will or will not be collected, or that the tariff is its mechanism. One mitigant is recorded in §5: on this item, AMD's own filing is the cautious document in the record — the company disclosed the legal vacuum in its own risk factor rather than booking the arrangement as settled fact.
Link 9 — The insider tape — CORROBORATED / PATTERN — NOT LOAD-BEARING
This link is published under a different grade from the rest of the chain, and the grade is part of the finding. The central claim of this report does not rest on it.
The ledger (computed from the primary dataset: all 278 Form 4 filings, 1,125 transactions parsed from ownership XML, zero parse failures; non-derivative code S/P only; values as filed). Open-market sales, 2023–2026: $820,572,664 (3,960,503 shares). Open-market purchases: $1,498,944 (13,445 shares). Ratio: 547.4:1. By year, sales ran $129.0M / $203.7M / $104.8M / $383.0M (2026 to 21 Nov); purchases were zero in 2023, 2024 and 2026. By person: Su $516,165,596 (2,424,226 shares; 2026 alone $247.8M); Papermaster $107.6M; Norrod $70.4M; Grasby $38.3M; Peng $30.6M; Hu $17.4M; Wolin $16.3M; all others ~$23.8M. The only open-market buyer in four years is EVP Philip Guido — 4,645 shares @ $107.56 on 7 Feb 2025 (acc. 0000002488-25-000014) and 8,800 @ $113.56 on 20 May 2025 (acc. 0000002488-25-000082). No other reporting person records a single purchase in the period. ~45% of sale value ($372,392,271) was filed in the same Form 4 as an option exercise (59 M+S filings). Su's largest sale dates: 10 Jun 2026 — $57,585,715; 13 May 2026 — $55,688,359; 10 Sep 2026 — $48,145,666; 16 Nov 2026 — $35,489,904 (acc. 0000002488-26-000213; five days after the first anniversary of Analyst Day — a timing fact, reported without inference).
The neutraliser, in the same paragraph, as it must be: 399 of 422 sale lines (94.5%) carry a Rule 10b5-1 footnote — $735,950,372, 89.7% of value. For Su: 203 of 203 sale lines, 100% of her $516.2M, are plan sales. The documented pattern is one-directional open-market selling by the executive team over four years, almost entirely under pre-arranged plans adopted months before the sales they cover. No conclusion about intent, information, or timing quality is drawn or implied anywhere in this report.
The adoption archaeology (Lane C, verified transaction-by-transaction against the raw XML; dataset: Lane C's Su 10b5-1 adoption archaeology). Su's 203 sale lines cite exactly five distinct plan adoption dates:
| Plan adopted | Sale lines | Value sold under plan | Sales run | Days, adoption → first sale (computed) |
|---|---|---|---|---|
| 8 Dec 2022 | 20 | $70,392,743 | Jun 2023 → Dec 2023 | 180 |
| 20 Nov 2023 | 43 | $134,173,852 | Feb 2024 → Dec 2024 | 93 |
| 2 Dec 2024 | 4 | $36,893,351 | 21 Aug 2025 (single date) | 262 |
| 9 Sep 2025 | 91 | $191,070,079 | 11 Dec 2025 → 18 Aug 2026 | 93 |
| 8 Jun 2026 | 45 | $83,635,571 | 10 Sep 2026 → 16 Nov 2026 | 94 |
The cadence is roughly annual re-adoption, each plan running ~6–11 months; three of the five adoption-to-first-sale gaps are 93–94 days. Set against claim events — timing facts only: the 9 Sep 2025 plan, under which $191.1M was sold between Dec 2025 and Aug 2026, was adopted 27 days before the OpenAI announcement (6 Oct 2025) and 63 days before Analyst Day (11 Nov 2025); its sales began 11 Dec 2025, after both events. The 8 Jun 2026 plan was adopted after the Meta announcement; no claim event in the record falls inside its adoption-to-first-sale window. Su recorded no sales at all between January and July 2025. In the two event windows themselves, the tape is uniformly plan-footnoted: 6–31 Oct 2025 — 7 sale lines, $4.4M, 100% footnoted, zero purchases; 11–30 Nov 2025 — 20 sale lines, $11.6M, 100% footnoted (Papermaster, 14 Nov, acc. 0000002488-25-000168; Norrod, 19 Nov, acc. 0000002488-25-000171; Hu — the officer who presented the model — 24 Nov, acc. 0000002488-25-000173), zero purchases. Analyst targets escalated in the same windows (secondary, as reported; the firms' notes are paywalled — UNRESOLVED against them): post-OpenAI, Barclays $200→$300, Jefferies $170→$300, BofA $250→$300, HSBC $185→$310; post-Analyst Day, Wells Fargo →$345, Cantor $350, Raymond James $337, Mizuho →$285, Morgan Stanley held at $260 — not unanimous; an aggregator median series runs $300 (Nov 2025) → $650 (Nov 2026).
A minor governance item, recorded for completeness: on 18 Nov 2026 the Board adopted amended and restated bylaws — advance-notice tightening for stockholder nominations and proposals, universal-proxy compliance mechanics, board information rights against proponents — effective immediately, without a stockholder vote (8-K filed 20 Nov 2026, acc. 0000002488-26-000218; contents as summarised from the filing — the full Ex. 3.1 text was not pulled, UNRESOLVED). Dates only; no inference drawn.
What this link establishes: a four-year, one-directional insider tape, plan-mechanical on its face, whose scale ($820.6M against $1.5M) and whose adoption cadence are documented facts a reader is entitled to weigh — and nothing more. It corroborates the promotion signature of Links 5–6; it carries no part of the chain's weight.
Chain grade: MODERATE — the chain is only as strong as its weakest load-bearing link, Link 8. Links 1–7 are Documented in primary records or computed from them and stand independently; Link 9 is pattern-grade and expressly non-load-bearing; the VIE-identity question (Link 3) is unresolved and expressly non-load-bearing. The report's central claim — the price and verifiability of admission — does not depend on the 15% ever being collected, on any insider's intent, or on any counterparty overlap.
3. The price-of-admission table — what headline revenue omits
Every line is sourced to a filing; lines marked computation are our arithmetic on disclosed figures, assumptions stated. Full sourced schedules: Lane A §6 and Lane C's warrant contra-revenue schedule and warrant dilution scenarios.
The customer warrants
| Item | Amount | Basis / source |
|---|---|---|
| Shares under warrant, two customers | 320,000,000 @ $0.01 (160M OpenAI, Oct 2025; 160M Meta, Feb 2026) | Disclosed — 8-Ks acc. 0001193125-25-230895 / 0000002488-26-000045 |
| Cash proceeds at full cash exercise | $3.2M | Computation |
| Operative terms (tranches, hurdles, conditions) | Not in the public record — Exhibits E/F redacted in full in both warrants; purchase agreements never filed | Disclosed as redacted/absent |
| Total grant-date fair value | $4,560M (320M × $14.25) | Computation — the filing never states the total |
| Recognised to date (revenue reduction) | ~$96M | Computation (6.72M share-equivalents × $14.25); filing does not reconcile a ~$36M residual — UNRESOLVED |
| Warrant liability at 26 Sep 2026 | $1.2B at $178.58/share fair value (12.53× grant-date) | Disclosed — Q3 2026 10-Q Note 14 |
| Remeasurement charge, Q3 2026 | $1,097M (three months = nine months; entirely a Q3 event) | Disclosed — face of the statements |
| Still to be recorded as a reduction of future revenue | $4.5B grant-date value, proportionally as qualifying revenue is recognised | Disclosed — Note 14 |
| Shares vested / in any EPS count | 0 — contingently issuable, excluded from basic and diluted EPS | Disclosed — Notes 13/14 |
| Dilution at full vesting | Count +19.51%; pre-existing holders diluted 16.33%; ">$20 EPS" restates to $16.73 | Computation — assumptions in §2, Link 6 |
| Qualifying revenue recorded to date | ~2.1% of the programme; dollars, customer split, GW equivalent undisclosed | Computation (proportion); dollars UNRESOLVED |
The guarantee & commitment stack (Q3 2026 10-Q, acc. 0000002488-26-000191)
| Item | Maximum | Basis / source |
|---|---|---|
| Data-center lease guarantees (credit derivatives) | $7.7B (was $4.1B, FY2025–Q2 2026) | Disclosed — Note 8; FY2025 10-K Note 19 |
| Commercial-partner debt guarantees (≤6 months) | $750M (new in Q3 2026) | Disclosed — Note 8 |
| Guarantees, total | $8.5B; no defaults, nothing paid, fair value not material | Disclosed — Note 11 |
| Consideration for guarantees | "May be issued in exchange for warrants" — issuers/amounts nowhere filed | Disclosed — Q1/Q2 2026 10-Q Note 8; UNRESOLVED in every particular |
| Leases not yet commenced, to be assigned/subleased to partners | $13.3B (10–15 yrs, from Q2 FY2027) | Disclosed — Note 11 |
| Cloud-compute take-or-pay backstop | $6,175M (CSPs, third-party shortfall) | Disclosed — Note 11 |
| Equity-investment commitments (to FY2028) | $5.1B | Disclosed — Note 11 |
| VIE equity stakes already carried (unnamed private cloud/SI) | $1.9B (from $1.1B at FY2025-end) | Disclosed — Notes 8/12 (first VIE note in AMD's history) |
| October 2026 investment, "an equity offering of a public company" | $1.0B — investee unnamed | Disclosed — Note 11 subsequent events |
| Commitment maxima, stack total | ≈$33.1B | Computation — maxima, not liabilities |
| Purchase commitments (for scale) | $48,761M | Disclosed — Note 11 |
| Counterparties named, any leg | None | Documented negative |
China (for completeness — a contingent, unquantified exposure)
| Item | Amount | Basis / source |
|---|---|---|
| MI308 inventory & related charges, Q2 2025 | ~$800M (Data Center segment operating loss $(155)M that quarter) | Disclosed — Q2 2025 10-Q acc. 0000002488-25-000108 |
| Reversed in FY2025 as licenses were granted | ~$360M (net ~$440M) | Disclosed — FY2025 10-K |
| 15% of licensed MI308 China revenue | Rate stated as an officials' "expectation"; no regulation published (filers' own words); no accrual or payment disclosed; MI308 revenue itself never quantified | Disclosed — FY2025 10-K; Q3 2026 10-Q; instrument UNRESOLVED |
| MI325 (2026) | Licenses granted Feb 2026; U.S. inspection stop; 25% Section 232 tariff on U.S. import for inspection; Chinese import permission unknown; revenue not quantified | Disclosed — 2026 10-Qs; BIS 91 FR 1684; WH Fact Sheet 14 Jan 2026 |
Headline revenue shows accelerators being sold. It shows none of the above.
4. Where our own screen was wrong
CHAIN reports publish their corrections. The lanes overruled the selection screen in the following places; the corrected record is what this report uses throughout.
- MATERIAL — the "two-day plan" juxtaposition is struck. The screen stated that a footnote in the 10 June 2026 Form 4 filing cites a Rule 10b5-1 plan "adopted… on June 8, 2026," two days before the sale it covers. Verified against the raw ownership XML, that attribution does not survive: the 10 June 2026 filing (acc. 0000002488-26-000107) cites the plan adopted 9 September 2025. The 8 June 2026 adoption is cited in the 10 September 2026 and 16 November 2026 filings — its first sale came 94 days after adoption, consistent with the 93-day gaps of Su's 2023 and 2025 plans. The two-day claim appears nowhere in this report except here, in its correction. (A related lane-level difference is resolved the same way: one lane's extraction captured four distinct Su adoption dates from date-stating footnotes and flagged the series as a floor; the transaction-level re-extraction found the complete series of five plans, including 2 Dec 2024 — §2, Link 9 uses the five.)
- "$4.1B guarantee" was stale. That was the FY2025 subsequent-event figure, repeated in Q1 and Q2 2026. At Q3 2026 the filed maximum is $7.7B of lease guarantees plus $750M of debt guarantees ($8.5B total), re-presented as credit derivatives (§2, Link 3). Any use of $4.1B as the current exposure understates the filed figure by half.
- Trigger precision. The screen treated the two first-tranche triggers together. The filed texts differ: OpenAI's first tranche vests on delivery, Meta's on shipment — physically distinct points in the chain (§2, Link 5).
- The Meta mirror is silence, not a pending pull. The screen's lane plan assumed Meta's filings would show some warrant treatment ("the one true counterparty mirror available"). They show none — zero mentions across four filings and no February 2026 8-K (§2, Link 4). The finding is the silence itself, and the screen's hope that Meta's paper would supply the redacted schedules is closed: it supplies nothing.
- Microsoft figures upgraded; one figure downgraded. The screen carried Microsoft's OpenAI figures from secondary summaries (its UNRESOLVED #8). They are now verified verbatim against the FY2026 10-K (acc. 0001193125-26-323660) and Q1 FY2027 10-Q. Conversely, the "$250B Azure commitment" the screen repeated from announcement coverage appears in neither Microsoft filing and is labelled announcement-language throughout this report.
- Su biography. The screen's lane brief framed a 13-year Texas Instruments tenure. AMD's own board biography records TI as 1994–95 (~one year, technical staff); the 13-year tenure was IBM (~1995–2007), then Freescale (2007–2012), then AMD from January 2012.
- Method note — an XBRL defect in AMD's own tagged record. In AMD's 2022–2024 10-Qs as retrieved from EDGAR, the inline-XBRL segment-member tags are rotated relative to the rendered segment tables: in the Q1 2024 10-Q, the fact tagged
DataCenterMemberis $922M — the rendered Gaming value — while the rendered Data Center value, $2,337M, sits under aClientMembercontext (the same rotation appears in Q1 2023). From the 2025 filings onward the tags agree with the rendered tables. Anyone pulling AMD segment history through XBRL APIs for those years inherits the error; aggregator datasets built on company-facts feeds carry Gaming revenue labelled as Data Center revenue for those quarters. Lane C's share series (§2, Link 7) is built from the rendered tables, cross-checked across filings, each figure summing to its filed annual. We report the rotation as an observation about the as-retrieved tagged record — the rendered tables are internally consistent — not as an allegation about the financial statements.
5. Counter-evidence — stated honestly
A chain that only counts one side is advocacy. The same primary record contains the following, and any reader weighing this report should weigh these too:
- The one completed guidance ladder was met — in a filing. AMD's 2024 MI300 guide was given only on calls, in five successive raises (>$2B → $3.5B → $4B → $4.5B → ~$5B, Oct 2023–Oct 2024); no same-quarter furnished release contains a GPU dollar figure. The filed result cleared it: "Data Center segment annual revenue nearly doubled as EPYC processor adoption accelerated and we delivered more than $5 billion of AMD Instinct accelerator revenue" (Q4 2024 release, 4 Feb 2025, acc. 0000002488-25-000009). Guidance-by-call has been aggressive in form and, in the one completed instance, accurate in outcome.
- The Data Center business is real, large, and growing on filed numbers. $16,635M in FY2025; $21,039M in 9M 2026; $8,546M in Q3 2026 alone — a record quarter, up ~97% year over year — with GAAP gross margin expanding across the series (44.9% → 49.5% → 53.5% for 9M 2026; the 2026 comparison is flattered by the absence of the prior-year MI308 charge, a driver the filing itself names). Nothing in this report alleges fabricated revenue, and nothing in the lanes' work supports such an allegation.
- Cash conversion is genuine — the opposite of the pattern this series exists to catch. FY2022–25 cumulative operating cash flow $15,982M against cumulative net income $8,150M; free cash flow positive in every year of the window ($3,115M / $1,121M / $2,405M / $6,735M). The quality caveat is stock-based compensation ($1,081M → $1,384M → $1,407M → $1,638M across FY2022–25; in FY2023 SBC was 162% of net income) — a real recurring transfer to employees, disclosed in full in every filing and added back in the cash-flow statement.
- The insider selling is plan-mechanical on its face. 94.5% of sale lines (89.7% of value) carry Rule 10b5-1 footnotes; 100% of Su's 203 sale lines and 100% of her $516.2M are plan sales, under five successively adopted plans each running months after adoption, three with 93–94-day adoption-to-first-sale gaps. The corrected record (§4.1) removes the one juxtaposition that could have suggested otherwise. Pattern only; no intent is asserted anywhere in this report.
- The clean negatives are documented, not assumed. No customer accounted for ≥10% of revenue in FY2024 or FY2025 (FY2025 10-K, verbatim). No Oracle equity deal exists in any filing searched. No filing shows AMD taking equity in OpenAI or Meta, or AMD revenue stated to depend on a customer's external financing. The guarantees carried no defaults and no payments at 26 Sep 2026, at fair values reported as not material; the VIE stakes are disclosed, non-consolidated on a stated primary-beneficiary analysis, with the equity leg's maximum exposure capped at carrying value.
- There is no filing-integrity event in this record. No restatement, no auditor change or rupture, no material-weakness disclosure, no indictment or regulatory charge appears in any filing searched for FY2022–Q3 2026. The one data-integrity item found is the XBRL tag rotation (§4.7) — a tagging defect whose rendered tables are internally consistent.
- The people record is a clean negative — stated as a finding. Across 278 Form 4s, the 10-K/10-Q series, the submissions record, and the adjacent-record sweeps: no indictment, SEC or other regulatory charge, restatement, auditor rupture, bankruptcy, failed prior venture, or adverse litigation item attaches to Dr. Su or to AMD in her tenure (CEO since Oct 2014; Chair since Feb 2022). Prior employers (TI 1994–95; IBM; Freescale) present no adverse item connected to her tenure in any record located.
- The market is not positioned against the story. Short interest (secondary — FINRA data as republished by two independent sources that agree to the share; FINRA's primary file was not retrieved): 38,603,935 shares, 2.38% of shares outstanding, 1.86 days to cover at 30 Oct 2026 — down from 59.4M at 31 Dec 2024, range-bound at 2.1–2.6% through 2025–26, and down 9.08% at the 28 Nov 2025 settlement, the first after Analyst Day. There is no crowded-short or squeeze signature in this series.
- On the 15%, AMD's filing is the cautious document in the record. The company disclosed the arrangement's legal vacuum in its own risk factor, in the 10-K and every 2026 10-Q, rather than presenting it as settled law; it quantified its charges ($800M) and reversals (~$360M) precisely, and stated plainly that it does not know whether MI325 imports will be allowed into China.
- The physical build-out is real, and absence of an AMD record is not absence of AMD racks. This investigation's own site work documents 618 MW delivered at Abilene by Sep 2026 and 2,262 MW of regulator-approved new generation for a single Meta site; AMD's Q3 2026 remarks state first Helios racks are online at OpenAI and Meta, and Sanmina's CFO confirms Helios shipping has begun. Data-centre fit-outs are routinely undisclosed at silicon level — Oracle's filings name no vendor for its documented NVIDIA deployments either. The headcount record also fully checks: ~25,000 (FY2022) → ~26,000 → ~28,000 → ~31,000 (FY2025), with the Q4 2024 ~4% restructuring ($186M of charges) disclosed in the same paper that shows net growth, and exactly two small California WARN notices (57 + 7) — WARN structurally cannot verify a dispersed global cut, and it falsifies no claim here.
None of this contradicts the chain. It bounds it: AMD is executing a real, cash-generative build-out of a real second-source business, while paying for admission to its next tier through structures whose costs are documented, material, and largely invisible in the numbers the story is told with — and describing that tier in claims that cannot, on the present record, be followed into a document.
6. Valuation — what the structures imply for what a share is
We do not publish a price target in a CHAIN report, and nothing in this section is a recommendation. What the filings' own numbers establish is a set of claims on the future equity and the future revenue line that sit ahead of, or alongside, the ordinary shareholder — and that any valuation of AMD must carry explicitly rather than discover later:
- Shares already promised. 320M shares at $0.01 — 19.5% of the current count — are contingently issuable to two customers and excluded from every EPS figure AMD publishes (Note 13). At full vesting the count rises to 1,960.1M and pre-existing holders are diluted 16.33% (computed). Total exercise proceeds: $3.2M. The warrants' §15 characterisation — a "sales discount or allowance" — is the correct valuation frame: this is price, paid in equity, not partnership alignment.
- The revenue line is pre-sold in part. $4.5B of grant-date fair value will be recorded as a reduction of revenue as qualifying revenue is recognised, on top of the ~$96M (computed) already recognised. The effective give-back rate is unknowable from the filings because qualifying revenue is undisclosed; under stated assumptions it spans 10.0%–45.6% of the revenue the deals generate (computed, §2 Link 2). A valuation that capitalises the warrant programmes' headline revenue at the company's ordinary revenue multiple, without the contra-revenue, overstates the stream by that rate.
- The charge floats with the price. The warrant liability is remeasured each period at fair value — $178.58/share at 26 Sep 2026 against a $14.25 grant-date value — with changes running through Other income (expense), net, until each tranche becomes exercisable. Holders underwriting the equity at higher prices are, mechanically, underwriting a larger remeasurement charge on every tranche not yet exercisable: the $1,097M Q3 charge was incurred on ~2.1% of the programme in a rising market. The better the story performs, the more the admission costs in reported earnings — until vesting converts the liability to APIC and the cost becomes permanent dilution instead.
- The model line assumes the old share count. The ">$20 non-GAAP EPS" line restates to $16.73 on the fully diluted warrant count (computed, assumptions stated). Any valuation anchored on the Analyst Day model must either use ~$16.73, or identify the additional ~$6.4B of non-GAAP net income (computed) that holding $20 on 1,960.1M shares requires — income the model, as printed, does not account for.
- Contingent claims ahead of common. ≈$33.1B of commitment maxima (computed) — $8.5B of guarantees as credit derivatives, a $6,175M take-or-pay compute backstop, $13.3B of partner-bound leases AMD has committed to take on, $5.1B of equity commitments — sit behind counterparty names no filing provides, alongside $48,761M of purchase commitments and an inventory build (+35% QoQ to $11,463M at Q3 2026, raw materials and WIP leading, finished goods falling: a production ramp, on the filing's own composition). The guarantees are carried at fair values AMD reports as not material, with no defaults to date; their maximum is what a stress case must carry, and the stress case cannot be specified because the counterparties are unnamed.
- The buyback does not offset the drift. Shares outstanding rose 1,630M → 1,640M in 9M 2026 despite a $14B repurchase authorisation of which $9.2B sits unused: in 9M 2026 AMD spent $221M on open-market repurchases and $1,836M repurchasing shares for employee tax withholding (Q3 2026 10-Q). The share count against which the warrant dilution will land is growing, not shrinking.
Scenario framing (reasoned, not priced). If the falsifiers in §7 begin to fire — a filed Instinct revenue base on the >80% path, a first tranche vesting on a disclosed gigawatt, the exhibits unredacted, the counterparties named and unconnected to the warrant customers — then the warrants become a bounded, if expensive, customer-acquisition cost: 16.33% dilution and a $4.56B grant-date revenue give-back (computed) exchanged for a documented second-source position in the largest build-out in the industry's history, and the guarantee stack becomes ordinary ecosystem finance with named, performing counterparties. If they do not — if qualifying revenue accrues slowly while remeasurement compounds at a rising share price, if the guarantee book keeps doubling in quarters when it is re-presented, and if the AI revenue base remains unfiled while the model prices the stock — then each quarter's reported revenue carries a growing contra-revenue shadow, each vesting milestone converts a floating charge into permanent dilution at $0.01, and the equity is a claim on a build-out whose admission price is still being marked. The filings support both branches as possibilities. They document the costs in both. Registration reference: $424.39 (20 Nov 2026); this report is scored at 6/12/24 months against SPY, whole, whatever the outcome.
7. What would break this chain — pre-registered falsifiers
Registered at CH-2026-005 opening (21 Nov 2026), from the selection screen as updated by the lanes, before drafting. Any one of these, documented, breaks the corresponding link, and we will publish the break:
- A filing disclosing Instinct/AI revenue (any period) with a base consistent with the >80% Data Center AI CAGR path — breaks Link 6's "no filed base" finding and materially weakens Link 7's framing. (Watch: 10-Qs/10-Ks segment notes, furnished releases with GPU dollar figures.)
- A first warrant tranche vesting on a disclosed 1 GW delivery (OpenAI) or shipment (Meta), with gigawatts delivered/shipped to date stated — breaks Link 5's "0% on the filed metric" finding and Link 2's zero-vesting premise. (Watch: Note 14 successors, vesting 8-Ks, Form 4s of the holders if any.)
- Unredacted Exhibits E/F — by amendment, 10-K exhibit, or counterparty filing — showing per-tranche terms consistent with the 8-K summaries. Breaks Link 1's redaction finding. (Watch: AMD exhibit filings; Meta's paper, which is currently silent.)
- VIE and guarantee counterparties named, with no overlap with warrant customers or qualifying-revenue sources — breaks Link 3's unnamed-stack finding, including the $4.1B-origin guarantee partner named with terms showing ordinary-course pricing. (Watch: Note 12 successors, counterparty filings.)
- MI308/MI325 China revenue quantified in a filing — breaks Link 8's undisclosed-base finding. (Watch: geographic/product revenue disclosures, MD&A.)
- Open-market purchases by named executive officers beyond the single $1.5M buyer of 2025 — breaks Link 9's one-directional tape. (Watch: Form 4 code P.)
- A primary government instrument for the 15% arrangement — a published regulation, executive order, license condition, or a disclosed accrual/payment in a filing — breaks Link 8's "no instrument" finding in whichever direction the instrument points. (Watch: Federal Register, BIS, AMD contingency disclosures.)
- A primary physical record naming AMD silicon at a named deployment site — a county permit or appraisal, a utility or interconnection-queue filing, or a counterparty engineering disclosure with counts — breaks Link 5's documented-absence finding. (Watch: Taylor County TX, Richland Parish LA, Licking County OH records; the ERCOT queue; customer engineering publications.)
- Disclosure of how AMD's non-GAAP definition treats warrant contra-revenue and remeasurement for the ">$20 EPS" model line, on a share count that includes the warrants — breaks Link 6's restatement premise. (Watch: non-GAAP reconciliations, updated long-range model publications.)
Standing watch list: quarterly warrant liability, fair-value-per-share, and any first vesting or APIC reclassification; the guarantee maximum and any default or payment; Note 12 successors (VIE carrying value, any counterparty naming); the unnamed $1.0B investee's identity if it surfaces in any filing; Meta's filings for any first mention of the warrant; Microsoft's OpenAI loop figures; MI325 import status and any 15% accrual; Texas WARN (pull outstanding, §9); NVIDIA's Q3 FY2027 10-Q for the Q3 2026 share pair; short interest at each FINRA settlement.
8. Unanswered questions — to be put in writing before publication
No company or agency named here has been contacted by phone or email in connection with this report. The following questions will be put in writing to AMD Investor Relations before publication, as a right of reply; responses, refusals and non-responses will be reported as such. They are the questions the public record cannot answer:
To AMD Investor Relations (right of reply): (1) How many gigawatts — or gigawatt equivalents — have been delivered (OpenAI) and shipped (Meta) to date under the two warrant programmes? (2) What dollar amount of qualifying customer revenue has been recorded to date under Note 14, split by customer, and which products does it represent? (3) Will Exhibits E and F to either warrant be filed unredacted — by amendment or as 10-K exhibits — and if not, what is the basis for withholding the vesting schedules of instruments over ~19.5% of the share count? (4) Who are the counterparties to the Note 12 VIE investments, the $8.5B of guarantees, the $6,175M cloud-compute commitments, and the $13.3B of partner-bound leases — by category if not by name — and is any of them also a warrant customer or a source of qualifying revenue? (5) Has any guarantee been issued in exchange for warrants, as the Q1/Q2 2026 10-Qs contemplate? If so, what warrants were received, from whom, and at what carrying value? (6) Which public company received the $1.0B October 2026 equity investment disclosed in Note 11? (7) The cloud-compute backstop commits AMD to pay for GPU capacity third parties do not purchase: whose GPUs does that capacity run on, and which CSPs are the counterparties? (8) How much MI308 revenue has been recognised under the resumed China licenses, and has any amount been accrued or paid in respect of the 15% U.S. government expectation described in the FY2025 10-K? (9) Is the 25% Section 232 tariff on MI325 imports for inspection the mechanism by which the percentage arrangement is collected? (10) How does the ">$20 non-GAAP EPS" long-range model treat warrant contra-revenue and remeasurement, and on what share count is it computed? (11) What are the MI455X's board power and the Helios rack's power draw, as AMD publishes them — and how is a "gigawatt" (OpenAI) or "gigawatt equivalent" (Meta) defined and measured under each agreement? (12) Has any MI325 unit been imported into China under the February 2026 licenses?
9. Sources & method — appendix
Method. Four investigation lanes, all retrievals 21–22 Nov 2026: (A) counterparty filings — the books of Meta, Microsoft, Oracle, CoreWeave and Nebius read against AMD's claims, plus the warrant-liability arithmetic reconciled from Notes 2/13/14; (B) physical and deployment records — the two 8-Ks' commitment text, site/utility/tracker records for the announced Stargate and Meta campuses, the ZT Systems/Sanmina rack path, headcount and WARN registers; (C) generated datasets — built by us from primary filings (below); (D) government and people paper — the BIS rule and Section 232 proclamation in primary text, the congressional record, the Analyst Day materials, and full Form 4 archaeology. Load-bearing claims rest on primary documents; reporting is labelled secondary wherever used. Figures were verified against the underlying filings before drafting; the lanes' corrections to the selection screen are published in §4.
Lane C datasets (from AMD CIK 0000002488 and NVIDIA CIK 0001045810 filings, and the screen's Form 4 dataset — all 278 Form 4 filings / 1,125 transactions parsed from EDGAR ownership XML, 0 parse failures): the data-center market-share series · the claims-vs-filings ledger · the warrant dilution scenarios · the warrant contra-revenue schedule · the insider ledger by person and year · the Su 10b5-1 adoption archaeology · the filing-drift counts. Filing-drift method: case-insensitive counts on filed document text after stripping HTML and the inline-XBRL header block; every screen count was independently reproduced. Market-share method: rendered segment tables (see §4.7 on the XBRL tag rotation), NVIDIA quarters paired to calendar quarters by end month; Q4 figures computed as filed annual minus filed nine-month totals and labelled as such in the CSV.
Selected drift counts (full table: Lane C's filing-drift counts):
| Search string | FY22 10-K | FY23 10-K | FY24 10-K | FY25 10-K | Q3'25 10-Q | Q1'26 10-Q | Q2'26 10-Q | Q3'26 10-Q |
|---|---|---|---|---|---|---|---|---|
export control |
4 | 5 | 8 | 16 | 12 | 11 | 18 | 15 |
MI308 |
0 | 0 | 0 | 14 | 14 | 7 | 10 | 8 |
MI325 |
0 | 0 | 1 | 1 | 0 | 8 | 8 | 6 |
\bwarrants?\b (excl. warranty) |
12 | 6 | 5 | 20 | 14 | 23 | 15 | 38 |
OpenAI |
0 | 0 | 0 | 10 | 4 | 8 | 8 | 1 |
\bMeta\b |
0 | 0 | 0 | 0 | 0 | 13 | 7 | 1 |
gigawatt |
0 | 0 | 0 | 4 | 0 | 2 | 2 | 0 |
AI revenue |
0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
variable interest entit… |
0 | 0 | 0 | 0 | 0 | 0 | 0 | 3 + Note 12 |
ROCm |
4 | 4 | 4 | 3 | 0 | 0 | 0 | 0 |
qualifying |
3 | 3 | 3 | 3 | 2 | 2 | 2 | 5 |
Principal primary documents (accession numbers where filed on EDGAR): - AMD 8-K, OpenAI warrant + Registration Rights Agreement (Ex. 10.1) + furnished release (Ex-99.1) — acc. 0001193125-25-230895 · AMD 8-K, Meta warrant — acc. 0000002488-26-000045 - AMD FY2025 10-K — acc. 0000002488-26-000018 (Notes 8, 19; risk factors) · FY2024 10-K — acc. 0000002488-25-000012 · FY2023 10-K — acc. 0000002488-24-000012 · FY2022 10-K — acc. 0000002488-23-000047 - AMD Q3 2026 10-Q — acc. 0000002488-26-000191 (Notes 2, 8, 10, 11, 12, 13, 14) · Q2 2026 10-Q — acc. 0000002488-26-000123 · Q1 2026 10-Q — acc. 0000002488-26-000076 · Q2 2025 10-Q — acc. 0000002488-25-000108 · Q3 2025 10-Q — acc. 0000002488-25-000166 · Q3 2025 8-K — acc. 0000002488-25-000163 - AMD 8-K, MI308 export control — acc. 0000002488-25-000039 · Q4 2024 earnings release — acc. 0000002488-25-000009 · ZT/Sanmina 8-K Ex-99.1 (19 May 2025) · Bylaw amendments 8-K — acc. 0000002488-26-000218 (contents via filing summaries; Ex. 3.1 not pulled) · DEF 14A — acc. 0001193125-26-129057 - AMD Form 4s: Guido purchases — acc. 0000002488-25-000014 (7 Feb 2025), acc. 0000002488-25-000082 (20 May 2025); Su sales — acc. 0000002488-26-000107 (10 Jun 2026), acc. 0000002488-26-000213 (16 Nov 2026); event-window sales — acc. 0000002488-25-000157 / -000159 (Oct 2025), acc. 0000002488-25-000168 / -000171 / -000173 (Nov 2025) - Meta 10-K FY2025 — acc. 0001628280-26-003942 · Meta 10-Qs 2026 — acc. 0001628280-26-028526 / -26-050705 / -26-066773 - Microsoft FY2026 10-K — acc. 0001193125-26-323660 · Microsoft Q1 FY2027 10-Q — acc. 0001193125-26-436133 - Oracle FY2026 10-K — acc. 0001193125-26-277521 · Oracle Q1 FY2027 10-Q — acc. 0001193125-26-389274 - CoreWeave FY2025 10-K — acc. 0001769628-26-000104 · CoreWeave Q3 2026 10-Q — acc. 0001769628-26-000465 · Nebius FY2025 20-F — acc. 0001104659-26-052948 - NVIDIA FY2026 10-K — acc. 0001045810-26-000021 · NVIDIA 10-Ks FY2023–FY2025 — acc. 0001045810-23-000017 / -24-000029 / -25-000023 - Government: BIS final rule, 91 FR 1684 (FR Doc. 2026-00789, RIN 0694-AK43, eff. 15 Jan 2026; govinfo.gov) · BIS press release, 13 Jan 2026 (bis.gov) · White House Fact Sheet, Section 232 proclamation, 14 Jan 2026 (whitehouse.gov) · House Select Committee on the CCP (Democrats), Krishnamoorthi statement, Aug 2025 (house.gov) · LPSC docket U-37425 (via Entergy Louisiana release and trade-press quotation — secondary presentation; docket not pulled in primary text) - Company-published, not filed: AMD Financial Analyst Day materials, 11 Nov 2025 (Globe Newswire release; Su and Hu decks/transcripts, AMD IR) · OpenAI publications (Stargate announcements; funding-round post) · AMD Q3 2026 prepared remarks, 3 Nov 2026 · AMD product specification pages (MI355X brief; MI455X page) - Secondary, labelled in text: FT/Reuters/Bloomberg/AP (Aug 2025 arrangement; presidential remarks) · analyst target summaries (TipRanks/TheFly/aggregators) · Sanmina CFO remarks via earnings reporting (9 Nov 2026) · site trackers (datacenterfootprint.org, Epoch AI, stargate compilations) · FINRA short-interest data as republished by ChartExchange and MarketBeat (two republishers, agreeing) · MLPerf/MLCommons summaries · GitHub telemetry (LFX Insights)
UNRESOLVED register (carried honestly; none of these is filled by inference anywhere in this report): - Warrants: per-tranche share counts, all intermediate price hurdles, and exercise conditions for both warrants (Ex. E/F redacted in full); the OpenAI Supply Agreement and Meta Amendment Eight (never filed — no prices, schedules, take-or-pay, or termination terms); the split of the $1.2B liability / $1,097M charge / qualifying revenue between OpenAI and Meta; GW delivered or shipped to date under either programme; the definition/measurement basis of "gigawatt"/"gigawatt equivalent"; MI455X board power and Helios rack power as published by AMD (neither exists); Helios racks shipped (any count); the ~$36M reconstruction residual; how AMD's non-GAAP definition treats warrant contra-revenue/remeasurement for the ">$20 EPS" line. - Counterparties & structure: VIE counterparty identities; guarantee counterparties and any overlap with warrant customers; whether warrants were actually received for any guarantee (issuers/amounts nowhere filed); CSP commitment and sublessee counterparties; the unnamed $1.0B October 2026 public-company investee; whether Meta's unnamed infrastructure escrows relate to AMD (not asserted either way); Meta's internal warrant carrying treatment; how OpenAI funds its commitment (no filing or publication addresses it); the lettered AR-concentration customers' identities. - Physical: AMD-specific deployment at any named site (county/utility/queue primary pulls at Taylor County, Richland Parish, Licking County and the ERCOT queue are the open route — not completed); LPSC U-37425/U-37882 and TCEQ dockets in primary text (relied on via labelled secondary); customer primary engineering evidence; Texas WARN (pull attempted, not completed); the "78% CUDA" figure (unverifiable, not cited). - China / government: Instinct/AI revenue in any period (never filed — the >80% CAGR has no filed base); MI308/MI325 revenue recognised under the resumed licences; any amount accrued or paid under the 15%; whether the 25% Section 232 tariff is the 15%'s collection mechanism; whether any MI325 unit has entered China; the BIS licenses themselves (not public; FOIA for the 15% arrangement's documentary basis is the recommended open follow-up — none filed). - Market/people: analyst targets against the firms' own notes (paywalled); Su's adoption series as a floor (only date-stating footnotes captured — resolved to five plans by Lane C's transaction-level extraction, §4.1); full Ex. 3.1 text of the Nov 2026 bylaw amendments; FINRA primary short-interest file (two agreeing republishers used); NVIDIA Q3 FY2027 (confirmed not yet filed, 22 Nov 2026) and NVIDIA quarterly DC splits for FY2023–24/Q1–Q2 FY2025 (not in the raw set); FY2025 10-K unconditional-purchase-commitments total (Q3 2026's $48,761M is the usable figure); the April 15, 2025 8-K quoted via the screen's EDGAR-mirror extraction (no local raw copy); the CRS report's treatment of the 15% arrangement (secondary summary only).
Corrections applied in this draft (lanes correcting the selection screen, adopted; full text in §4): the "two-day plan" juxtaposition struck (the 10 Jun 2026 filing cites the 9 Sep 2025 plan; the 8 Jun 2026 plan's first sale came 94 days after adoption); "$4.1B guarantee" superseded by $8.5B; OpenAI trigger = delivery, Meta trigger = shipment; the Meta mirror is silence, not a pending pull; Microsoft figures verified at primary text and the "$250B Azure commitment" relabelled announcement-language; Su biography corrected (TI 1994–95; the 13 years were IBM); Lane D's four-date Su plan floor superseded by Lane C's complete five-plan series; the XBRL segment-tag rotation in AMD's 2022–24 10-Qs recorded as a method note (§4.7).
CH-2026-005 · Strativest Research — CHAIN series. Pre-registered 21 Nov 2026; entry reference $424.39 (Finnhub close, Fri 20 Nov 2026); scoring 21 May 2027 · 21 Nov 2027 · 21 Nov 2028 vs SPY. Nothing in this report is investment advice, and no position in any security named is disclosed or implied by its authorship.
v1.0 — original publication, Nov 21, 2026; no corrections.
RELATED RESEARCH NVIDIA (NVDA) — Chain investigation · Intel (INTC) — Chain investigation · Super Micro Computer (SMCI) — Chain investigation