STRATIVESTRESEARCH
In simple words: Iron Mountain stores the world's paper — records for more than 240,000 companies, including about 95% of the Fortune 1000 — and is spending the cash that business throws off on building data centers. In the first nine months of 2026 it leased 137 megawatts of data-center capacity, nearly 28% of its entire existing base, into a base that was already 97% full; its data-center arm grew revenue 40% and now earns a 56% margin on the space that has opened. Revenue rose 14–22% in every quarter of 2026, management raised its own cash-earnings guidance at four straight prints, and the dividend went up 15%. Yet the shares fell 11% on the strongest of those prints, because building all this costs more cash each year than operations bring in, on a balance sheet carrying about $18 billion of borrowings. At $112.43 the shares trade at 41 times forward GAAP earnings — right at the median of the data-center, storage and logistics landlords it now belongs with — and at about 19 times the cash earnings the sector actually prices. Fairly priced is the call: neither the bargain the cash multiple alone suggests, nor the premium an older comparison claimed.
FAIRLY PRICED — at $112.43 (1.03x the real-asset REIT peer median)
Close (Nov 11, 2026)
$112.43
Forward P/E
41.35x
Peer median fwd P/E
40.05x
Ratio
1.03x
Price / AFFO (2°)
18.92x
Dividend yield
3.53%
Analyst centre (2°)
$138.73
Reviews
May 12, 2027 · Nov 12, 2027

Phase 1 REVISED, stated openly — Phase 1's falsifier tested mechanically and NOT fired on any leg, and the revision is not claimed as a falsifier event: Phase 1 (Oct 28, 2026) called IRM OVERVALUED at $114.78 (forward P/E 45.05x vs a peer median of 25.26x, ratio 1.78x; trailing P/E 81.82x; PEG 3.76). Its fairly-priced multiple trigger needed a forward P/E at or below ~29.1x at unchanged estimates — the actual is 41.35x, and estimates in fact rose (implied forward EPS $2.7193 vs $2.5478 implied by Phase 1's own figures, +6.7%); its PEG trigger needed a PEG at or below ~1.5 — the print is 3.45; its bubble trigger needed a forward P/E above ~50.5x — not met. The Phase 2 peer median was rebuilt like-for-like (40.05x vs Phase 1's broad office, health-care, services and diversified-REITs median of 25.26x — a group priced on low-depreciation models), narrowing the measured premium from 1.78x to 1.03x, inside the fair band on the headline construction and on both sensitivities (1.06x excluding DLR; 1.09x against storage and logistics alone). The AFFO cross-check — 18.92x vs a 24.04x two-name reporting-peer median (0.79x) — and the analyst centre (+23.4%) corroborate the revision's direction; borrowings of $17,972M, negative book equity of −$1,388M and a trailing GAAP multiple of 73.48x are why it stops at fairly priced. One discrepancy stated openly: Phase 1's $114.78 vs the verified Oct 28, 2026 close of $115.67 (−0.77%) is not a split adjustment — the last split was 1.5-for-1 in Jan 2007, nearly two decades before both prints; it is a basis difference in Phase 1's price pull. The value-trap gate is passed decisively (revenue +21.6% / +18.5% / +13.5% across 2026 on the primary spine). The bubble test is not met: ratio 1.03x vs the 1.50x leg, and the price 15.5% below its June 2026 high and below both moving averages.

The IT factor: the contracted data-center growth that has been leased but has not yet commenced billing. Iron Mountain leased 137 MW in the first nine months of 2026 — 32 MW through April, 110 MW through July (75 MW in July alone), 102 MW in Q3 alone (releases, primary) — against a 488 MW base that was ~97% leased at Dec 31, 2025, with 400 MW energising over the next 24 months toward 1,340 MW of potential capacity (10-K, primary). The segment the leases land in grew revenue +39.6% over the nine months to $791.2M with segment Adjusted EBITDA of $424.1M (+44.0%) at a 56.3% Q3 margin (10-Q segment note, primary), while carrying $9,225M of assets — 41.3% of the company — against 13.3% of revenue: the asset base is built ahead of its billing. Project Matterhorn, whose ~$574M of transformation costs ran through the GAAP line, was completed in 2025. Proves it: Q4 2026 delivering AFFO per share inside the raised $5.94–6.00 guide with data-center growth sustained near 30%; a FY2027 AFFO guide at or above the 2026 growth rate; trailing-twelve-month leasing at or above ~175 MW with commencements named. Kills it: a single-digit-MW leasing quarter without explanation; data-center growth below ~15% for two quarters while assets keep growing; a guidance cut at any print; segment margin compressing materially below 50% at commencement; borrowings rising materially faster than segment EBITDA for two quarters. Counterweight: the shares are +35.5% in 2026 and the Nov 5 print was sold −11.09% despite the leasing headline — the factor argues the commencement schedule is underweighted against the build cost, not that the growth is unseen.

Price — a full transformation cycle in one line

IRM indexed = 100 (Nov 2020)SPY indexed = 100 Daily closes, Nasdaq official history, Nov 2, 2020 – Nov 11, 2026 (1,514 sessions). No split inside the window (last split 1.5-for-1, Jan 2007).
Full window vs SPY
+323.9% / +130.1%
vs 50-day ($113.49)
−0.9%
vs 200-day ($115.99)
−3.1%
Off series high $133.06
−15.5%
2026 YTD
+35.5%
Off 52-wk low $78.86
+42.6%

The 2026 prints trace the argument: February (Q4 2025 print, guidance initiated) +5.77% on 5.86M shares; April (first guidance raise) +10.02% on 5.04M; August (second raise) +1.29%; November (third raise, dividend +15%, 102 MW leased in the quarter) −11.09% on 4.35M. The first two raises were bought aggressively, the third absorbed, the fourth — the strongest filed quarter of the year — sold hard: by November the build's cost was the argument, not the growth's existence. Last 7 sessions: price −2.39% on a signed lit-volume balance of +4.23M shares — MIXED, the fall bought but not yet repaired.

Valuation — the label's evidence (SECONDARY multiples, verified prices)

Method: implied forward EPS = stockanalysis.com basis price ÷ printed forward P/E, held fixed and re-struck at the verified Nasdaq Nov 11, 2026 close. The set is real-asset REITs like-for-like: EQIX and DLR (global data-center REITs), PSA and EXR (scaled self-storage REITs) and PLD (Prologis, logistics — the closest scale comparable). Office, health-care and net-lease REITs are excluded — their GAAP multiples are set by low-depreciation, bond-like models, and they were Phase 1's group; residential REITs are excluded (a consumer housing cycle); AMT and CCI are excluded with the caveat printed in the report. Sensitivity, stated openly: excluding DLR, the median is 38.99x and the ratio is 1.06x; against storage and logistics alone the median is 37.95x and the ratio is 1.09x — inside the 0.90x–1.15x fair band on every construction.

NameNov 11 closeForward P/EP/SAnalyst target (2°)
IRM — Iron Mountain$112.4341.35x4.29x$138.73
EQIX — Equinix$1,068.0656.28x10.40x$1,234.88
DLR — Digital Realty Trust$181.1370.47x9.87x$224.13
PSA — Public Storage$335.7337.95x12.93x$341.39
EXR — Extra Space Storage$159.2133.33x9.84x$161.50
PLD — Prologis$130.0340.05x12.75x$152.07
Peer median (5)40.05x10.40x

Ratio 41.35 / 40.05 = 1.03x re-struck, 1.06x on the printed basis (42.07x vs a 39.75x median) — inside the fair band on both, with the value-trap gate passed decisively. AFFO cross-check (company-defined): 18.92x re-struck vs DLR 23.67x and PLD 24.41x (median 24.04x, 0.79x); on primary prints, TTM AFFO per share of $5.84 gives 19.25x and the guided FY2026 midpoint of $5.97 gives 18.83x — weighted as a two-name, company-defined cross-check: enough to rule out overvalued, not enough to carry undervalued against the leverage record. Scenarios on the $2.72 implied forward EPS: bear 30% ≈ $81 (EPS ~$2.45 at ~33.0x — commencements slip, the guide goes flat, the multiple de-rates to the storage end), base 50% ≈ $109 (EPS $2.72 at the 40.05x median — the raised guide delivered, the multiple holding), bull 20% ≈ $138 (EPS ~$3.00 at ~46.0x — the backlog commences on schedule and the multiple re-rates toward the data-center end) — probability-weighted ≈ $106, −5.4% below the price: a distribution centred essentially on the price.

Is the P/E rational? Partly — and at this price the rational and irrational parts roughly cancel. The rational part: GAAP earnings genuinely understate this issuer's economics (depreciation on capacity whose rents have not commenced, a completed transformation programme's costs in the trailing line), but the equity is also a levered claim on a commencement schedule — $17,972M of borrowings, negative book equity, a 6.08x debt/EBITDA print (SECONDARY) — and a median multiple prices that leverage honestly. What the price does not add is a premium beyond the set's own: the data-center peers carry the same depreciation geometry, and against them IRM is at 1.03x on GAAP and 0.79x on printed AFFO, with the set's fastest filed revenue growth and a 3.53% yield. The rational band on the current implied EPS is ~$98 (0.90x the median) to ~$125 (1.15x); the call price sits inside it, nearer the middle than either edge. P/S is given limited weight: IRM's revenue blends a large services engine (destruction, digital, ALM) with its rent roll, so its sales multiple compares a blended base against purer rent rolls.

Revenue — last 8 filed quarters (primary, $bn)

2024Q41.62025Q11.62025Q21.72025Q31.82025Q41.82026Q11.92026Q22.02026Q32.0

SEC EDGAR spine (companyfacts; Revenues tag through 2021, RevenueFromContractWithCustomerExcludingAssessedTax from 2022 — scope verified against the releases). The spine reproduces the secondary TTM prints to rounding (revenue $7,799.0M vs $7.80B; EPS $1.53 summed vs $1.53 printed; OCF $1,703.6M vs $1.70B; capex $2,240.5M vs $2.24B; FCF −$536.8M vs −$536.82M). Spine net income is consolidated, including noncontrolling interests ($477.1M TTM vs the $458.5M attributable print — the difference is the noncontrolling share). Year-over-year revenue growth in 2026: Q1 +21.6%, Q2 +18.5%, Q3 +13.5%.

Leadership eras

EraPricevs SPYWorst drawdown
Nov 2020 – Aug 2022 · Meaney, pre-Matterhorn — the records franchise compounding out of the pandemic base: revenue to $4,492M by FY2021, EPS $1.19 then $1.55, cumulative net income of $943M across seven filed quarters+98.4%+19.7%−22.5%
Sep 2022 – Dec 2025 · Meaney, the Matterhorn build — revenue grew every year to $6,902M while the GAAP line was spent down: ~$574M of transformation costs and rising data-center depreciation took EPS from $1.90 to $0.49 even as AFFO per share (company-defined) rose to $5.17; cumulative FCF −$1,715.5M is the build in one line+55.7%+72.0%−40.0%
Jan 2026 – Nov 2026 · Meaney, post-Matterhorn — the AFFO guide raised at every print, 137 MW leased in nine months, the dividend raised 15%, net income of $384.0M in three filed quarters+35.1%+11.2%−20.7%

No CEO change spans the window (Meaney has been CEO since 2013 — DEF 14A 2026, primary); the splits are the programme turns the filings mark — Project Matterhorn's September 2022 announcement and its completion in 2025 — stated openly. Guidance record (releases, primary; all AFFO figures company-defined): FY2026 AFFO per share initiated at $5.69–5.79 in Feb 2026 → raised to $5.79–5.86 in April → $5.87–5.93 in August → $5.94–6.00 in November, with the revenue guide raised from $7,625–7,775M to $7,950–8,020M alongside. Nine-month AFFO per share sums to $4.40 against the full-year range, leaving a guided Q4 of ~$1.57 — the ladder is scored on full-year delivery in February. Consensus beat/miss figures beyond the releases' own statements are UNVERIFIED.

Sector & bottleneck position

Iron Mountain served more than 240,000 customers in 61 countries at the FY2025 10-K (primary), including approximately 95% of the Fortune 1000, with no customer above ~3% of revenue, from ~1,340 locations. Nine months to Sep 30, 2026 (10-Q segment note, primary): Global RIM (records and information management) revenue $4,270.7M and Adjusted EBITDA $1,868.4M; Global Data Center revenue $791.2M (+39.6%) and Adjusted EBITDA $424.1M (+44.0%) on segment assets of $9,225M; Corporate and Other (ALM and Fine Arts) revenue $893.9M (+55.9%). Records management is a scale oligopoly of trust — chain-of-custody reputation and regulatory standing built over decades, sticky contracts, slowly declining volumes, Iron Mountain the global leader. Data centers are a capital oligopoly of energised capacity: the scarce input is powered, connected, permitted capacity in the right metros, and the 488 MW base at ~97% leased with 1,340 MW of potential capacity is a position inside that scarcity. It passes the scarcity test on energised capacity and custody scale and fails the pricing test: grid and permitting queues bind for everyone, but IRM is a price-taker at the margin of hyperscaler procurement, its capacity is a fraction of the pure-plays', and the RIM base that funds the build faces a slow structural volume decline. Recorded as a Bottleneck Intelligence lead only; no gate score assigned or moved — a balance-sheet-funded participant in the power-and-capacity bottleneck, not its owner.

Ownership — a professional float, one sector specialist of size

The proxy (primary, Mar 4, 2026) is the register of record: holders above 5% are Vanguard 46,275,110 (15.9%), BlackRock 29,851,678 (10.2%), Cohen & Steers 19,106,540 (6.5%) — a real-estate-specialist manager, the register's sector signal — and State Street 16,568,963 (5.7%). Directors and officers as a group hold 2,445,554 shares plus 2,748,799 vested options (1.7% in total) — the CEO holds 394,307 shares plus 2,620,582 vested options (1.0%) and the CFO 326,623 shares — so alignment runs substantially through the CEO's option position, recorded as a fact of the proxy. Secondary prints, labelled: stockanalysis.com prints insiders at 0.83% and institutions at 86.33%; the Nasdaq 13F aggregate prints 99.99% institutional ownership on 297,811,629 shares across 1,292 holders — effectively the entire register, a known artefact of layered 13F reporting, reported as printed and never summed with the proxy blocks. As printed, 612 holders increased positions (13,125,707 shares) against 473 who decreased (20,502,825), with 124 new positions against 82 sold out — a distribution lean in shares against an accumulation lean in holder count, with the caveat that the aggregate's holder rows are mixed-date (Dec 31, 2025 – Jun 30, 2026). The count itself creeps up: 297,833,786 shares at Oct 30, 2026 (primary), +0.59% year over year (SECONDARY), on TTM buybacks of nil — per-share progress has to come from AFFO growth, and on the filed record it has (+18.0% over the nine months).

08-0508-1208-1908-2609-0209-1009-1709-2410-0110-0810-1510-2210-2911-05

Weekly signed lit volume, last 14 weeks (from the verified price series): net +1.38M shares, negative in 6 of 14 weeks — a mild accumulation lean on the weekly measure, against the 13F aggregate's share-count distribution lean; both are printed and neither is load-bearing. Last 7 sessions verdict: MIXED (price −2.39%; signed balance +4.23M shares across the Nov 5 print window).

Options — simple view

Nasdaq chain (SECONDARY), crawled Nov 12, 2026; three expiries served (Nov 13, Nov 20 and Nov 27, 2026; 166 strike rows). Call open interest 3,288 vs put open interest 2,788 (put/call 0.85) — a small, two-sided chain: roughly 6,100 contracts in total against 1,319,408 shares traded on Nov 11. The largest calls sit above the price into Nov 20 — $125.00 (1,015 contracts) and $130.00 (944), toward the levels held before the Nov 5 print; the largest puts sit below it — Nov 20 $102.00 (1,228) and $100.00 (740), bracketing the print-day low from underneath. Read whole, the chain fences a post-print range rather than expressing a direction. Implied volatility, expected move, later expiries and dated unusual flow: UNVERIFIED.

Dark pool & short interest

Dark pool (ChartExchange, SECONDARY, FINRA-reported): 30-day-average off-exchange share 47.31% (lit 52.69%); the Nov 11, 2026 session's own split was 49.71% off-exchange — a real session print, modestly above the 30-day norm, on a +1.49% session; the print session itself (Nov 5) ran 45.26%, with no venue signature separating the sell-off from the recovery sessions around it. Largest prints and the venue breakdown are UNVERIFIED, and no directional claim is made from dark-pool data. Short interest (FINRA settlements via the published ChartExchange table — IRM is NYSE-listed, so the Nasdaq endpoint does not serve it): 7,042,041 shares at the Oct 30, 2026 settlement = 2.36% of the primary share count, 5.56 days to cover (elevated only because average volume is modest) — and falling across the year: from 10,906,244 at the Dec 15, 2025 settlement, shorts covered roughly 3.9M shares during a year in which the shares rose 35.5% (the stockanalysis.com print of 7.15M matches the older Oct 15 settlement; the dossier uses Oct 30). Borrow (ChartExchange/IB, SECONDARY, single-source): 0.28% fee, 4,100,000 shares available — cheap and plentiful. A retreating short base against a fairly priced, heavily-owned REIT — positioning colour, not squeeze geometry.

Catalysts, risks & falsifier

Catalysts: Q3 2026 13F filings (~Nov 14, 2026); the Nov 20, 2026 options expiry (the $125/$130 calls and $102/$100 puts); late-November and mid-December short-interest settlements, with the Q4 dividend record date on Dec 15, 2026; data-center leasing and commencement updates as they file through Dec 2026 – Jan 2027; and the Q4 2026 print with the FY2027 guidance initiation (early Feb 2027, by cadence) — the scoring event for both the label and the IT factor: full-year AFFO per share against the $5.94–6.00 guide, data-center revenue growth, the FY2027 AFFO guide against the AFFO guard, year-end borrowings and cumulative leasing. Risks: commencement risk (the label capitalises a signed backlog whose revenue depends on energised capacity delivered against grid and construction timelines; a slip converts growth capital into carrying cost on $17,972M of borrowings); leverage (negative book equity of −$1,388M, a 6.08x debt/EBITDA print — no slack for a simultaneous leasing stall and rate shock); the legacy base (RIM is 71.7% of nine-month revenue and faces a slow digitisation headwind that revenue management has so far outrun); hyperscaler concentration at the growth margin (75 MW leased in a single month is a handful of counterparties on their own capex cycles); a median multiple that can simply stay at the median, leaving the 3.53% yield and AFFO growth as the return engine; and GAAP optics that will keep screening as distress in one direction and promotion in the other. Falsifier: to UNDERVALUED — forward P/E below ~36.05x at unchanged estimates (about $98 on the current implied EPS), or convergence by estimates falling toward the multiple. To OVERVALUED — forward P/E above ~46.06x at unchanged estimates (about $125). AFFO guard — price/AFFO on the company's own guided AFFO per share above ~24.0x at an unchanged guide, or a FY2027 AFFO guide initiated below the FY2026 $5.94–6.00 range: the label is then reviewed toward overvalued regardless of the GAAP multiple. Value-trap trigger — revenue growth below 0% for two consecutive quarters, or data-center segment growth below 15% for two consecutive quarters while segment assets keep growing. To BUBBLE — only on the full three-leg test (ratio ≥ 1.50x, estimates rising, price accelerating); only the estimates leg is met at the call. IT factor dies on a single-digit-MW leasing quarter without explanation, two quarters of sub-15% data-center growth with assets still growing, a guidance cut at any print, segment margin compressing materially below 50% at commencement, or borrowings rising materially faster than segment EBITDA for two quarters.

Limitations & sources

UNVERIFIED (nothing load-bearing rests on any of these): options IV, expected move and dated unusual flow; expiries beyond Nov 27, 2026; the Nov 11, 2026 largest dark-pool prints and venue split (the session's 49.71% off-exchange share is a published FINRA-reported figure); the single-source borrow print; the pension-fund ownership subset; Form 4 insider totals; a single-date 13F positioning series (the Nasdaq aggregate is mixed-date and its 99.99% print is a layered-reporting artefact); 2026 quarterly consensus figures beyond the releases' own statements; the own-history forward P/E range; Q4 2026 print and 10-K dates (cadence estimates); per-megawatt lease pricing (not filed — no $/MW figure is used anywhere); Phase 1's internal peer-group composition (its registered figures are quoted in full in the report). Construction notes, stated openly: no split falls inside the price window (the last split was 1.5-for-1 on Jan 3, 2007, SECONDARY) and no manual adjustment was needed or made — the Phase 1 price gap ($114.78 vs the verified $115.67 close) is NOT explained by any split and is recorded as a basis difference in Phase 1's price pull. Revenue merges two XBRL tags by verified scope (Revenues through 2021; RevenueFromContractWithCustomerExcludingAssessedTax from Q1 2022 — before 2022 that tag is a component line only), verified against the releases at Q1 2025, nine-month 2025 and Q3 2026, and the spine reproduces the secondary TTM prints to rounding (revenue $7,799.0M vs $7.80B; EPS $1.53 vs $1.53; OCF $1,703.6M vs $1.70B; capex $2,240.5M vs $2.24B; FCF −$536.8M vs −$536.82M). Net income on the spine is consolidated ProfitLoss including noncontrolling interests ($477.1M TTM) against the secondary attributable print of $458.5M — the difference is the noncontrolling share. FFO (Normalized), AFFO, Adjusted EBITDA and Adjusted EPS are company-defined measures, used only where labelled and always from the releases' or the segment note's own prints; the label basis is the forward GAAP multiple, with AFFO as a cross-check whose weight is argued in the report. The Sep 30, 2026 balance sheet is taken from the Q3 2026 10-Q (cash $188M as printed on the filed balance sheet — the companyfacts instant series carries no Q2/Q3 2026 entry under that tag, a tagging gap recorded here; borrowings $16,739M noncurrent plus $1,233M current on the XBRL lines, against the secondary total-debt print of $20.49bn which includes lease and other obligations and is never mixed with the borrowing lines inside a figure; equity −$1,388M; assets $22,323M). Free cash flow is one definition only — the spine's −$536.8M TTM, negative by construction of a REIT mid-build. Sources: SEC EDGAR (companyfacts, FY2025 10-K, Q1–Q3 2026 10-Qs, DEF 14A 2026, earnings releases Q4 2025–Q3 2026) and Nasdaq official daily history (1,514 sessions), option-chain and institutional endpoints as primary; stockanalysis.com and ChartExchange as labelled SECONDARY. This call — FAIRLY PRICED at $112.43 — is pre-registered in the dossier's registry_entry.json (Nov 12, 2026; reviews May 12, 2027 and Nov 12, 2027), alongside the Phase 1 outcome (REVISED; falsifier tested mechanically and not fired, revision on a disclosed peer-set basis change). Research and education — not personalised buy/sell advice.